Centre County · State College Borough · #PAD140129

Penn State Pollock Halls

State College Borough, PA · institutional

In short: Penn State Pollock Halls is an institutional project in State College Borough, Centre County, PA. As of November 24, 2026, it is under construction according to web research. Latest record: Penn State's May 2026 news story says plumbing and framing are done and tile work is under way in Wolf and Ritner halls, with reopening planned for August 2026. What usually happens next: completion and occupancy.

Under construction Penn State's May 2026 news story says plumbing and framing are done and tile work is under way in Wolf and Ritner halls, with reopening planned for August 2026. · web research checked Nov 6, 2026 · source AI research
  1. Proposed
  2. In reviewJan 2025
  3. Approved
  4. PermittedMay 2025
  5. Under construction
  6. Completed

Usually next: completion and occupancy.

About this project

Penn State project at Pollock Halls in State College Borough, Centre County, filed for a DEP construction stormwater permit.

Applicant
THE PA STATE UNIV
Plan type
Construction stormwater permit (DEP)
Land use
Commercial or industrial
Status
Site active

Project history

  • 2025-05-19 · State construction stormwater permit issued May 19, 2025 · source
  • 2025-01-16 · #PAD140129 · Construction stormwater permit (DEP)
  • 2025-01-16 · State construction stormwater permit application received Jan 16, 2025 · source

DEP site record (eFACTS) →

The full picture AI research · Nov 6, 2026

Penn State is renovating the Pollock Halls residence hall complex at University Park, in State College Borough. The complex has nine student housing buildings from the 1960s. The university chose to rebuild the insides of the existing buildings rather than tear them down. The work is split into phases.

Phase 1 covers Wolf and Ritner halls. It adds climate control, better accessibility, upgraded study and laundry rooms, community kitchens, shared bathrooms on each floor and more lounge space. Penn State said in May 2026 that this phase was nearly done and on schedule to reopen for the fall 2026 semester. The state stormwater permit in the county records is tied to this kind of site work.

Later phases cover Hiester and Shulze, then the other halls, with the whole complex expected to finish in fall 2030. No opposition was found. Penn State will use the halls for student housing.

What it could mean nearby

Where it stands

Work is past the permit stage. The state stormwater permit was issued May 19, 2025, and Penn State said in May 2026 that the first phase was nearing completion for a fall 2026 reopening. Later phases follow one after another through 2030.

Who's behind it

The Pennsylvania State University · Penn State is the public research university that owns and operates the Pollock Halls; it is using a design-build team led by Clayco, with Mackey Mitchell Architects and DLA+ Architecture.

Around the web

Planning terms explained
NPDES / construction stormwater permit
A state permit required when building work disturbs an acre or more of land, to control muddy runoff.
Design-build
A method where one team handles both the design and the construction of a project.
Land development plan
A site plan the municipality reviews for buildings, parking and drainage.
Phase
One stage of a multi-part project, built and opened in sequence.

Researched by AI from public sources on Nov 6, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: Penn State's Board of Trustees funds the phases, and State College Borough's planning commission and council review related site plans in public meetings, where residents can comment.

This is a state stormwater construction permit (NPDES) from the Pennsylvania Department of Environmental Protection. The building plans themselves are decided by State College Borough.

Find State College Borough's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Not enough detail to estimate.