Centre County · State College Borough · #PAD140123
Westerly & Easterly Parkway
State College Borough, PA · recreation
In short: Westerly & Easterly Parkway is a recreation project in State College Borough, Centre County, PA. As of November 24, 2026, it is permitted (building or site permits issued). Latest record: State construction stormwater permit issued Feb 24, 2025 (February 24, 2025). What usually happens next: site work and construction.
Usually next: site work and construction.
About this project
A recreational facility project along Westerly and Easterly Parkway in State College Borough, Centre County, filed by the borough for a construction stormwater permit.
- Applicant
- STATE COLL BORO CENTRE CNTY
- Plan type
- Construction stormwater permit (DEP)
- Land use
- Recreational facility
- Status
- Site active
The full picture AI research · Nov 6, 2026
The borough's records describe a recreation project along Westerly and Easterly Parkway. Public coverage points to a new shared-use path, meaning a paved trail for walking and biking. It would run along the parkway from University Drive to O'Bryan Lane. It would link the Walnut Springs area to the Orchard Park bikeway.
This is one of two path segments the borough is building, about 1.6 miles in total. The other segment is on Blue Course Drive. In April 2026 the borough council approved a low construction bid of about $3.37 million from a paving and excavation contractor. State transportation grant money covers about $2.9 million of that.
A June 2026 borough advisory board agenda reportedly says four trees along Easterly Parkway would be removed. It also says a paved path would replace the existing sidewalk. No opposition was found. No source confirms that work has started or finished.
What it could mean nearby
- Walkers and cyclists would get a continuous paved connection between Walnut Springs and the Orchard Park bikeway.
- A paved path would replace the existing sidewalk along Easterly Parkway.
- Four trees along Easterly Parkway are reportedly slated for removal.
- Construction was expected to run from late May to early December 2026, so some disruption along the parkway is possible.
Where it stands
The state construction stormwater permit was issued in February 2025, and the borough awarded the construction contract in April 2026. Construction was scheduled to start in late May 2026. No source found confirms it has begun or finished.
- Jun 2026 Borough advisory board agenda reportedly discusses removing four trees along Easterly Parkway
- Apr 21, 2026 Borough council approves the construction bid of about $3.37 million (reported on this date)
- Feb 24, 2025 State construction stormwater permit issued
- Aug 15, 2024 Borough files for the construction stormwater permit
Who's behind it
State College Borough (project owner); Glenn O. Hawbaker Inc. (low-bid contractor) · The borough is the local government that owns the project. The contractor is a Centre County construction firm that won the bid.
Around the web
- State College moving forward with long-planned new shared-use pathsStateCollege.com · Apr 21, 2026Council approved the roughly $3.37 million construction bid; work was expected from late May to Dec. 2.
- State College Shared Use Path, TASAConstructConnectA bid listing for shared-use pathways in State College Borough.
Planning terms explained
- Shared-use path
- A paved trail separated from the road that people can walk, run or bike on.
- Construction stormwater permit
- A state permit that requires erosion and runoff controls while the ground is disturbed.
- Transportation Alternatives Set-Aside
- A state and federal grant program that pays for walking and biking projects.
- Consent agenda
- A group of routine items that a council approves together in one vote.
Researched by AI from public sources on Nov 6, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: State College Borough Council and the borough's advisory boards handle the project. Residents can comment at their public meetings.
This is a state stormwater construction permit (NPDES) from the Pennsylvania Department of Environmental Protection. The building plans themselves are decided by State College Borough.
- DEP lists permit applications in the Pennsylvania Bulletin, usually with a 30-day window for written comments to the DEP regional office named in the notice.
- For the project itself, speak at a State College Borough planning commission or governing body meeting when the plan is on the agenda.
Find State College Borough's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- The Retreat At Westerly0.5 mi · industrial · State College Borough · filed 2025-01-21
- Penn State Pollock Halls0.9 mi · institutional · State College Borough · filed 2025-01-16
- Hastings & University Student Housing Facility1.1 mi · apartments · State College Borough · filed 2025-11-25
- Centre Hills Country Club1.4 mi · recreation · State College Borough · filed 2026-03-04
- Commercial/industrial stormwater permit, Harris Twp2.4 mi · industrial · Harris Township · filed 2026-01-16
- Blue Spring Enclave2.6 mi · single-family homes · Harris Township · filed 2025-09-18