Centre County · Harris Township · #PAD140144

Commercial/industrial stormwater permit, Harris Twp

Harris Township, PA · industrial

In short: Commercial/industrial stormwater permit, Harris Twp is an industrial development in Harris Township, Centre County, PA. As of November 24, 2026, it is permitted (building or site permits issued). Latest record: State construction stormwater permit issued Jun 3, 2026 (June 3, 2026). What usually happens next: site work and construction.

Permitted State construction stormwater permit issued Jun 3, 2026 · Jun 3, 2026 · source
  1. Proposed
  2. In reviewJan 2026
  3. Approved
  4. PermittedJun 2026
  5. Under construction
  6. Completed

Usually next: site work and construction.

About this project

A state construction stormwater permit for a commercial or industrial site in Harris Township, Centre County.

Plan type
Construction stormwater permit (DEP)
Land use
Commercial or industrial
Status
Site active

Project history

  • 2026-06-03 · State construction stormwater permit issued Jun 3, 2026 · source
  • 2026-01-16 · #PAD140144 · Construction stormwater permit (DEP)
  • 2026-01-16 · State construction stormwater permit application received Jan 16, 2026 · source

DEP site record (eFACTS) →

The full picture AI research · Nov 6, 2026

County records show a state construction stormwater permit was authorized on 2026-01-16 for an industrial or commercial site in Harris Township, Centre County. The permit covers earth disturbance, meaning grading and digging that expose soil, and it requires erosion and runoff controls while the site is built.

The records don't give the site's address, the developer, the size of the building, or the future tenant. Web searches found no news coverage, township meeting items, developer pages, listings or business notices about this project. Because of that, what is on the ground today could not be confirmed. The permit suggests site work could start or may already have started, but no source shows it.

No certificate of occupancy or completion appears in the county records.

What it could mean nearby

Where it stands

A state construction stormwater permit was authorized on 2026-01-16, and no completion or occupancy record exists. Building and site work usually follows the permit, and a certificate of occupancy is issued once the work passes inspection.

Around the web

Planning terms explained
Construction stormwater permit
A state permit (NPDES) that requires a site to control erosion and muddy runoff while soil is disturbed.
Earth disturbance
Activity such as clearing, grading or excavating that exposes soil.
Certificate of occupancy
A local sign-off that a finished building passed inspection and can be used.
Land development
The local approval process for building on or subdividing a parcel.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 6, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: Harris Township's planning commission and Board of Supervisors handle local land development matters, and residents can comment at their public meetings. The township municipal building is in Boalsburg.

This is a state stormwater construction permit (NPDES) from the Pennsylvania Department of Environmental Protection. The building plans themselves are decided by Harris Township.

Find Harris Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Not enough detail to estimate.