Lehigh County · Upper Macungie Township · #PAD390323
V Parkland
Upper Macungie Township, PA · single-family homes
In short: V Parkland is a single-family home development in Upper Macungie Township, Lehigh County, PA. As of November 24, 2026, it is permitted (building or site permits issued). Latest record: State construction stormwater permit issued Feb 25, 2026 (February 25, 2026). What usually happens next: site work and construction.
Usually next: site work and construction.
About this project
Residential subdivision in Upper Macungie Township, Lehigh County, filed for a DEP construction stormwater permit.
- Applicant
- V PARKLAND LLC
- Plan type
- Construction stormwater permit (DEP)
- Land use
- Residential subdivision
- Status
- Site active
The full picture AI research · Nov 6, 2026
V Parkland is a residential subdivision in Upper Macungie Township, Lehigh County. It is meant to hold single-family homes. The county filing was made to get a state construction stormwater permit. That permit covers controlling runoff and erosion while a site is being graded and built.
The county records do not give a home count or acreage, and no online source gave one either. No developer or builder web page, home listing, news story or township meeting item about this project could be confirmed. Nothing found shows what is on the site today, whether work has begun, or whether homes are for sale.
The only firm named on the filing is V PARKLAND LLC.
What it could mean nearby
- Construction traffic and some noise are likely once grading starts, which is typical for a stormwater-permitted site. No traffic study was found.
- New single-family homes would add households in the township. The exact number is not in the records found.
- Stormwater controls are required under the state permit to limit runoff and sediment leaving the site.
Where it stands
The state construction stormwater permit was issued on Feb 25, 2026, so the project has reached the permitted stage. Site work and home building could follow, but no source found shows that either has started, and no certificate of occupancy or completion appears in the records.
- Feb 25, 2026 State construction stormwater permit issued
- May 12, 2025 Latest county filing for the project
Who's behind it
V PARKLAND LLC
Planning terms explained
- Construction stormwater permit
- A state permit that requires a builder to control erosion and runoff from a construction site.
- Subdivision
- Dividing a larger piece of land into separate lots that can be built on or sold.
- Certificate of occupancy
- A municipal document confirming a finished building is safe to occupy.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 6, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The township's planning commission and supervisors handle local subdivision matters, and meeting agendas are posted on the Upper Macungie Township website, but no open decision on this project was found.
This is a state stormwater construction permit (NPDES) from the Pennsylvania Department of Environmental Protection. The building plans themselves are decided by Upper Macungie Township.
- DEP lists permit applications in the Pennsylvania Bulletin, usually with a 30-day window for written comments to the DEP regional office named in the notice.
- For the project itself, speak at a Upper Macungie Township planning commission or governing body meeting when the plan is on the agenda.
Find Upper Macungie Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Twin Ponds Mixed Use Developmentsame area · apartments · Upper Macungie Township · filed 2024-06-11
- Lehigh Valley West 57same area · industrial · Upper Macungie Township · filed 2025-03-07
- Eli Lilly pharmaceutical plant, 797,432 sq ftsame area · 797,432 sq ft non-residential, industrial · Upper Macungie Township · filed 2026-03-24
- Western Lehigh Land Developmentsame area · industrial · Lower Macungie Township · filed 2025-05-29
- Eastern Lift Truck Building Additionsame area · industrial · Upper Macungie Township · filed 2025-02-25
- Dollar General - Mertztown subdivisionsame area · retail & commercial · Longswamp Township · filed 2024-08-13