In short: Proposed Comm Tower At Warrior Rdg is an industrial development in Rush Township, Centre County, PA. As of November 24, 2026, it is permitted (building or site permits issued). Latest record: State construction stormwater permit issued Apr 29, 2026 (April 29, 2026). What usually happens next: site work and construction.
Usually next: site work and construction.
About this project
A proposed communications tower by Upward Broadband in Rush Township, Centre County, covered by a state construction stormwater permit.
- Applicant
- UPWARD BROADBAND
- Plan type
- Construction stormwater permit (DEP)
- Land use
- Commercial or industrial
- Status
- Site active
The full picture AI research · Nov 6, 2026
Upward Broadband, a company that provides internet by radio signal from towers, has a proposed communications tower at a site called Warrior Ridge in Rush Township, Centre County. County records describe it as an industrial-type project. It is covered by a state construction stormwater permit, which allows ground to be disturbed for building.
The records give no height, exact address or design. No township agendas, news stories, company announcements or listings were found for this site. A similarly named Warrior Ridge tower from Upward Broadband turned up in Huntingdon County. It is a different location, so it was not used.
What is on the ground today is unknown. The stormwater permit was authorized on 2025-08-28, and no record of completion or operation was found.
What it could mean nearby
- Towers like this usually need little daily traffic once built. Construction may bring temporary truck and equipment trips, but no source for this site confirms access details.
- If it supports Upward Broadband's service, nearby homes and businesses might get another internet option. No source confirms coverage for this tower.
- The stormwater permit means ground will be disturbed. Rules require erosion and runoff controls during construction.
Where it stands
County records show the state construction stormwater permit was authorized on 2025-08-28. After that, the tower would typically be built and then put into service, and no record of either was found.
- Aug 28, 2025 State construction stormwater permit authorized; this is the latest county filing
Who's behind it
Upward Broadband · A Pennsylvania fixed wireless internet provider that builds towers to serve rural areas.
Planning terms explained
- Construction stormwater permit
- A state permit that allows a builder to disturb the ground if it controls erosion and muddy runoff.
- Earth disturbance
- Digging, grading or clearing land during construction.
- Fixed wireless
- Internet delivered by radio signal from a tower to a receiver at a home or business.
- Certificate of occupancy
- A municipal document saying a finished building is safe to use.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 6, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The permit has already been authorized. Residents with questions can contact the Rush Township supervisors or the PA Department of Environmental Protection, which administers the stormwater permit.
This is a state stormwater construction permit (NPDES) from the Pennsylvania Department of Environmental Protection. The building plans themselves are decided by Rush Township.
- DEP lists permit applications in the Pennsylvania Bulletin, usually with a 30-day window for written comments to the DEP regional office named in the notice.
- For the project itself, speak at a Rush Township planning commission or governing body meeting when the plan is on the agenda.
Find Rush Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Self-storage building in Huston Township6.4 mi · warehouse & storage · Huston Township · filed 2026-02-17
- 1-lot split with residual, Cooper Township7.5 mi · lot line change · Cooper Township · filed 2026-01-28
- MPG Solar8.2 mi · industrial · Burnside Township · filed 2025-12-11
- Fillmore Market & Cafe9.2 mi · retail & commercial · Patton Township · filed 2025-03-03
- Foxlane Homes At Buffalo Run9.4 mi · single-family homes · Benner Township · filed 2026-06-03
- Windswept Farm Subdivision9.5 mi · single-family homes · Patton Township · filed 2024-04-04