Centre County · Burnside Township · #PAD140142
MPG Solar
Burnside Township, PA · industrial
In short: MPG Solar is an industrial development in Burnside Township, Centre County, PA. As of November 24, 2026, it is permitted (building or site permits issued) according to web research. Latest record: County records show the construction stormwater permit was authorized 2025-12-11, and a February 2026 news report said construction was expected to start in… What usually happens next: site work and construction.
Usually next: site work and construction.
About this project
A construction stormwater permit for a commercial or industrial project by MPG Solar in Burnside Township, Centre County.
- Applicant
- MPG SOLAR LLC
- Plan type
- Construction stormwater permit (DEP)
- Land use
- Commercial or industrial
- Status
- Site active
Project history
- 2025-12-11 · #PAD140142 · Construction stormwater permit (DEP)
- 2025-12-11 · State construction stormwater permit application received Dec 11, 2025 · source
The full picture AI research · Nov 6, 2026
MPG Solar LLC plans a large solar power farm in northern Centre County. It would be a 162-megawatt array across nine parcels totaling about 908 acres in Burnside and Snow Shoe townships, mostly south of Pine Glen Road. Planned parts include access roads, equipment pads, stormwater controls and a substation near Short Dog Lane.
Much of the land is former strip-mine ground that the county describes as largely unproductive. County records show the state-required construction stormwater permit for earth disturbance was authorized on 2025-12-11.
A February 2026 news report said construction was expected to start in November 2026 and finish in mid-to-late 2028. No report was found confirming work has actually begun. The developer's representative was named as Energix Renewables.
What it could mean nearby
- Construction traffic and equipment on Pine Glen Road (Route 879) and local access roads would be likely, though no traffic study was found.
- The project would reuse former strip-mine land and other unused acreage instead of active farmland.
- The developer plans site-specific training with the Pine Glen and Snow Shoe fire companies and Snow Shoe EMS.
- The developer would reimburse the county and township for plan review and inspection costs under an agreement.
Where it stands
The stormwater permit for earth disturbance has been issued, but the February 2026 report said the land development plan still needed county planning commission approval and other permits. Next steps are the remaining approvals, then site clearing and construction, and finally connection to the grid. Note: Some online trackers place an "MPG solar farm" in York County or credit a different developer, but the local news report places this project in Burnside and Snow Shoe townships.
- 2028 Expected completion, per news reports
- Nov 2026 Construction expected to start, per the February 2026 report (not confirmed)
- Feb 24, 2026 County commissioners heard an overview and advanced a cost-reimbursement agreement
- Dec 11, 2025 Construction stormwater permit (earth disturbance) authorized
Who's behind it
MPG Solar LLC · A solar project company represented by Energix Renewables, which develops, builds and operates renewable energy projects in the U.S.
Around the web
- 908 acre solar project planned in northern Centre CountyStateCollege.com · Feb 24, 2026Gives the size, parcels, timeline, pending approvals and cost agreement for the project.
- New solar farm planned near Pine Glen area of Centre County (WJAC)now.solar (WJAC report) · Feb 26, 2026Confirms the 908-acre site on abandoned strip-mine land with construction hoped for later in 2026 and completion in 2028.
- Energix developer pageCleanviewLists MPG Solar, 162 MW in Pennsylvania, as an Energix project in development.
Planning terms explained
- Land development plan
- A detailed site plan that a municipality or county reviews before building can proceed.
- Construction stormwater permit
- A state permit that sets rules for controlling runoff and erosion while soil is being disturbed.
- Memorandum of understanding
- A written agreement between parties, here covering who pays for plan review and inspection.
- Substation
- Equipment that raises the voltage of the solar power so it can enter the electric grid.
- Megawatt (MW)
- A unit of power; 162 MW is enough to supply many thousands of homes.
Researched by AI from public sources on Nov 6, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The Centre County Planning Commission must still approve the land development plan, and residents can comment through the county planning office or the township supervisors' public meetings.
This is a state stormwater construction permit (NPDES) from the Pennsylvania Department of Environmental Protection. The building plans themselves are decided by Burnside Township.
- DEP lists permit applications in the Pennsylvania Bulletin, usually with a 30-day window for written comments to the DEP regional office named in the notice.
- For the project itself, speak at a Burnside Township planning commission or governing body meeting when the plan is on the agenda.
Find Burnside Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- 1-lot subdivision, Karthaus Township4.1 mi · subdivision (use not stated) · Karthaus Township · filed 2026-05-27
- 1-lot subdivision with residual, Karthaus Twp4.5 mi · subdivision (use not stated) · Karthaus Township · filed 2026-05-27
- 2-lot consolidation, Karthaus Township4.8 mi · lot line change · Karthaus Township · filed 2026-10-28
- 1-lot split with residual, Cooper Township5.8 mi · lot line change · Cooper Township · filed 2026-01-28
- Lot consolidation with residual, Covington Township7.7 mi · lot line change · Covington Township · filed 2026-08-26
- Proposed Comm Tower At Warrior Rdg8.2 mi · industrial · Rush Township · filed 2025-08-28