Centre County · Burnside Township · #PAD140142

MPG Solar

Burnside Township, PA · industrial

In short: MPG Solar is an industrial development in Burnside Township, Centre County, PA. As of November 24, 2026, it is permitted (building or site permits issued) according to web research. Latest record: County records show the construction stormwater permit was authorized 2025-12-11, and a February 2026 news report said construction was expected to start in… What usually happens next: site work and construction.

Permitted County records show the construction stormwater permit was authorized 2025-12-11, and a February 2026 news report said construction was expected to start in November with other approvals still pending. · web research checked Nov 6, 2026 · source AI research
  1. Proposed
  2. In reviewDec 2025
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: site work and construction.

About this project

A construction stormwater permit for a commercial or industrial project by MPG Solar in Burnside Township, Centre County.

Applicant
MPG SOLAR LLC
Plan type
Construction stormwater permit (DEP)
Land use
Commercial or industrial
Status
Site active

Project history

  • 2025-12-11 · #PAD140142 · Construction stormwater permit (DEP)
  • 2025-12-11 · State construction stormwater permit application received Dec 11, 2025 · source

DEP site record (eFACTS) →

The full picture AI research · Nov 6, 2026

MPG Solar LLC plans a large solar power farm in northern Centre County. It would be a 162-megawatt array across nine parcels totaling about 908 acres in Burnside and Snow Shoe townships, mostly south of Pine Glen Road. Planned parts include access roads, equipment pads, stormwater controls and a substation near Short Dog Lane.

Much of the land is former strip-mine ground that the county describes as largely unproductive. County records show the state-required construction stormwater permit for earth disturbance was authorized on 2025-12-11.

A February 2026 news report said construction was expected to start in November 2026 and finish in mid-to-late 2028. No report was found confirming work has actually begun. The developer's representative was named as Energix Renewables.

What it could mean nearby

Where it stands

The stormwater permit for earth disturbance has been issued, but the February 2026 report said the land development plan still needed county planning commission approval and other permits. Next steps are the remaining approvals, then site clearing and construction, and finally connection to the grid. Note: Some online trackers place an "MPG solar farm" in York County or credit a different developer, but the local news report places this project in Burnside and Snow Shoe townships.

Who's behind it

MPG Solar LLC · A solar project company represented by Energix Renewables, which develops, builds and operates renewable energy projects in the U.S.

Around the web

Planning terms explained
Land development plan
A detailed site plan that a municipality or county reviews before building can proceed.
Construction stormwater permit
A state permit that sets rules for controlling runoff and erosion while soil is being disturbed.
Memorandum of understanding
A written agreement between parties, here covering who pays for plan review and inspection.
Substation
Equipment that raises the voltage of the solar power so it can enter the electric grid.
Megawatt (MW)
A unit of power; 162 MW is enough to supply many thousands of homes.

Researched by AI from public sources on Nov 6, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The Centre County Planning Commission must still approve the land development plan, and residents can comment through the county planning office or the township supervisors' public meetings.

This is a state stormwater construction permit (NPDES) from the Pennsylvania Department of Environmental Protection. The building plans themselves are decided by Burnside Township.

Find Burnside Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Not enough detail to estimate.