Northampton County · Upper Mount Bethel Township · #2026-11-slate-belt-technology-campus-design-2-6 · Data centers tracker
Slate Belt Technology Campus Design 2 (6 buildings)
Along River Road, Marshfield Drive, Demi Road and Potomac Street, Upper Mount Bethel Township, PA · 1,400,000 sq ft non-residential, data center
In short: Slate Belt Technology Campus Design 2 (6 buildings) is a data center project in Upper Mount Bethel Township, Northampton County, PA. It would add 1,400,000 sq ft of non-residential space. Its estimated construction value is about $980.0M, a rough estimate from its size. As of November 24, 2026, it is in review. Latest record: Upper Mount Bethel Township Planning Commission: preliminary land development review (November 18, 2026). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.
Usually next: a planning commission recommendation, then a vote by the town's governing body.
About this project
Slate Belt Holdings, LLC proposes six data center buildings, about 1.4 million sq ft per the narrative with 35-foot heights, as an alternative to Design 1 on the same River Road campus (five west, one east). The land is zoned industrial and was previously approved for the River Pointe industrial park, and it includes areas mapped for farmland preservation.
County recommendation: Raises serious concerns
Issues raised: Electrical demand still stated at 2,100 MW for six buildings, Square footage differs between narrative and site plans, Norfolk Southern rail bridge clearance limits, Unclear which design (1 or 2) will be pursued
- Applicant
- Slate Belt Holdings, LLC
- Plan type
- Preliminary land development
- Land use
- data-center
- Zoning
- Industrial
Project history
- 2026-11-18 · Upper Mount Bethel Township Planning Commission · Preliminary land development review · source
- 2026-11-17 · #2026-11-slate-belt-technology-campus-design-2-6 · Preliminary land development · 1,400,000 sq ft
Map pin is approximate.
The full picture AI research · Nov 18, 2026
Slate Belt Holdings, LLC wants to build six data center buildings on its River Pointe campus in Upper Mount Bethel Township. Together they would total about 1.4 million square feet, and each would stand about 35 feet tall. A data center is a large building full of computer servers. This layout, called Design 2, is an alternative to a Design 1 for the same land. It puts five buildings on the west side and one on the east.
The land is zoned industrial and was earlier approved as the River Pointe industrial park. Part of it is mapped for farmland preservation. News reports say the developer is a partnership between Talen Energy and River Pointe Logistics. It bought about 755 acres in April 2026 and floated a 23-building concept with a large on-site substation.
The project is contested. The developer has filed a legal challenge claiming the township's zoning does not properly allow data centers. Environmental groups and many residents oppose the project. No tenant has been announced, and no construction was found.
What it could mean nearby
- Traffic and access: the Lehigh Valley Planning Commission has said before that road infrastructure around the River Pointe park is inadequate. The details of that review were not confirmed for this plan.
- Utilities: earlier concept plans for the campus included a 480-megawatt on-site substation, so power and water use are central concerns raised by opponents.
- Open space: part of the site is mapped for farmland preservation, and residents in neighboring Lower Mount Bethel Township have said they will fight the project.
- Jobs and tax effects were not detailed in the sources found.
Where it stands
The county records show a preliminary land development plan (a detailed site plan) reviewed by the Lehigh Valley Planning Commission on 2026-11-17. The township Planning Commission has it on its Nov 18, 2026 agenda. Township supervisors and the Zoning Hearing Board would decide later, including on the developer's separate zoning challenge.
- Nov 18, 2026 Upper Mount Bethel Planning Commission agenda lists preliminary land development review (upcoming)
- Nov 17, 2026 Lehigh Valley Planning Commission reviewed the preliminary land development plan
- Sep 1, 2026 News report on the supervisors' 3-2 vote to keep working on the developer's draft agreement and strengthen the data center ordinance
- Aug 24, 2026 Township supervisors met on the developer's draft agreement (MOU)
- Jul 2026 Developer filed a zoning validity challenge against the township
- Apr 2026 Slate Belt Holdings bought about 755 acres of the River Pointe site
Who's behind it
Slate Belt Holdings, LLC · A partnership between Talen Energy and River Pointe Logistics, according to news reports. It was formed to develop a data center campus on the former River Pointe industrial park land.
Around the web
- LVPC MeetingsLehigh Valley Planning Commission · Nov 17, 2026Shows the preliminary land development plan was reviewed on 2026-11-17.
- Planning Commission Agenda Nov 18, 2026Upper Mount Bethel Township · Nov 18, 2026Lists the plan for township Planning Commission review. The file could not be read as text, so this rests on the county records.
- Upper Mount Bethel supervisors coverage of Aug 24 meetingTNonline · Sep 1, 2026Describes the developer, the 755-acre purchase, the validity challenge, the draft MOU and resident opposition.
- Delaware Riverkeeper Network page on the Slate Belt data centerDelaware Riverkeeper Network · Aug 14, 2026An advocacy group opposes the draft MOU and the 754-acre campus.
- Talen looks to develop 23-building data center campus in PennsylvaniaDatacenterDynamicsReports the earlier concept of up to 23 buildings and a 480 MW substation (from search summary; page itself could not be opened).
- Slate Belt Holdings Technology Campus tracker entryMore Than Just Parks · Jul 28, 2026Lists the campus as proposed, first reported July 28, 2026.
Planning terms explained
- Preliminary land development
- A detailed site plan showing buildings, roads and drainage that the township and county review before final approval.
- Validity challenge
- A legal claim by a landowner that a town's zoning rules are unlawful, here because they allegedly leave out data centers.
- MOU (memorandum of understanding)
- A non-binding draft agreement between the township and the developer on zoning changes, funding and the legal dispute.
- Lehigh Valley Planning Commission
- A regional advisory body that reviews large plans and gives comments but does not approve or deny them.
- Farmland preservation
- Land mapped or set aside to keep it in agricultural use rather than developed.
Researched by AI from public sources on Nov 18, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The township Planning Commission reviews the plan first (Nov 18, 2026 agenda), then the Board of Supervisors decides. Residents can comment at those public meetings or write to the township, and the Zoning Hearing Board hears the separate validity challenge.
In Pennsylvania, Upper Mount Bethel Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the Upper Mount Bethel Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Upper Mount Bethel Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find Upper Mount Bethel Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Estimated construction value: $980.0M
- ~7,000 roofing squares (assumes 2 stories)
- ~3,500 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Slate Belt Technology Campus Design 1 (29 buildings)same area · 3,300,000 sq ft non-residential, data center · Upper Mount Bethel Township · filed 2026-11-17
- JBar Pocono LLC site plansame area · other · Knowlton Township · filed 2024-01-09
- Industrial building on State Route 94same area · 30,000 sq ft non-residential, industrial · Knowlton Township · filed 2025-11-20
- 16-building multi-family residential developmentsame area · apartments · White Township · filed 2026-07-16
- Building permit (new construction) in Belvidere Townsame area · 353,525 sq ft non-residential, warehouse & storage · Belvidere Town · filed 2025-10-21
- Hummer Solar Farmsame area · industrial · White Township · filed 2024-09-24