Slate Belt Technology Campus Design 2 (6 buildings)

Along River Road, Marshfield Drive, Demi Road and Potomac Street, Upper Mount Bethel Township, PA · 1,400,000 sq ft non-residential, data center

In short: Slate Belt Technology Campus Design 2 (6 buildings) is a data center project in Upper Mount Bethel Township, Northampton County, PA. It would add 1,400,000 sq ft of non-residential space. Its estimated construction value is about $980.0M, a rough estimate from its size. As of November 24, 2026, it is in review. Latest record: Upper Mount Bethel Township Planning Commission: preliminary land development review (November 18, 2026). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

In review Upper Mount Bethel Township Planning Commission: preliminary land development review · Nov 18, 2026 · source
  1. Proposed
  2. In reviewNov 2026
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: a planning commission recommendation, then a vote by the town's governing body.

About this project

Slate Belt Holdings, LLC proposes six data center buildings, about 1.4 million sq ft per the narrative with 35-foot heights, as an alternative to Design 1 on the same River Road campus (five west, one east). The land is zoned industrial and was previously approved for the River Pointe industrial park, and it includes areas mapped for farmland preservation.

County recommendation: Raises serious concerns

Issues raised: Electrical demand still stated at 2,100 MW for six buildings, Square footage differs between narrative and site plans, Norfolk Southern rail bridge clearance limits, Unclear which design (1 or 2) will be pursued

Applicant
Slate Belt Holdings, LLC
Plan type
Preliminary land development
Land use
data-center
Zoning
Industrial

Project history

  • 2026-11-18 · Upper Mount Bethel Township Planning Commission · Preliminary land development review · source
  • 2026-11-17 · #2026-11-slate-belt-technology-campus-design-2-6 · Preliminary land development · 1,400,000 sq ft

LVPC committee packet (PDF) →

Map pin is approximate.

The full picture AI research · Nov 18, 2026

Slate Belt Holdings, LLC wants to build six data center buildings on its River Pointe campus in Upper Mount Bethel Township. Together they would total about 1.4 million square feet, and each would stand about 35 feet tall. A data center is a large building full of computer servers. This layout, called Design 2, is an alternative to a Design 1 for the same land. It puts five buildings on the west side and one on the east.

The land is zoned industrial and was earlier approved as the River Pointe industrial park. Part of it is mapped for farmland preservation. News reports say the developer is a partnership between Talen Energy and River Pointe Logistics. It bought about 755 acres in April 2026 and floated a 23-building concept with a large on-site substation.

The project is contested. The developer has filed a legal challenge claiming the township's zoning does not properly allow data centers. Environmental groups and many residents oppose the project. No tenant has been announced, and no construction was found.

What it could mean nearby

Where it stands

The county records show a preliminary land development plan (a detailed site plan) reviewed by the Lehigh Valley Planning Commission on 2026-11-17. The township Planning Commission has it on its Nov 18, 2026 agenda. Township supervisors and the Zoning Hearing Board would decide later, including on the developer's separate zoning challenge.

Who's behind it

Slate Belt Holdings, LLC · A partnership between Talen Energy and River Pointe Logistics, according to news reports. It was formed to develop a data center campus on the former River Pointe industrial park land.

Around the web

Planning terms explained
Preliminary land development
A detailed site plan showing buildings, roads and drainage that the township and county review before final approval.
Validity challenge
A legal claim by a landowner that a town's zoning rules are unlawful, here because they allegedly leave out data centers.
MOU (memorandum of understanding)
A non-binding draft agreement between the township and the developer on zoning changes, funding and the legal dispute.
Lehigh Valley Planning Commission
A regional advisory body that reviews large plans and gives comments but does not approve or deny them.
Farmland preservation
Land mapped or set aside to keep it in agricultural use rather than developed.

Researched by AI from public sources on Nov 18, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The township Planning Commission reviews the plan first (Nov 18, 2026 agenda), then the Board of Supervisors decides. Residents can comment at those public meetings or write to the township, and the Zoning Hearing Board hears the separate validity challenge.

In Pennsylvania, Upper Mount Bethel Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

Find Upper Mount Bethel Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Estimated construction value: $980.0M