Mercer County · Pymatuning Township · #2025-09-18-400-sq-ft-addition-at-cronimet-facili
18,400 sq ft addition at Cronimet facility
Reynolds Industrial Park, Pymatuning Township, PA · 18,400 sq ft non-residential, industrial
In short: 18,400 sq ft addition at Cronimet facility is an industrial development at Reynolds Industrial Park in Pymatuning Township, Mercer County, PA. It would add 18,400 sq ft of non-residential space. Its estimated construction value is about $2.4M, a rough estimate from its size. As of November 24, 2026, it is in review. Latest record: Minor preliminary/final land development reviewed at a meeting of the county planning commission (September 16, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.
Usually next: a planning commission recommendation, then a vote by the town's governing body.
About this project
Cronimet Specialty Metals plans to add an 18,400 sq ft building to its existing facility in Reynolds Industrial Park. The addition will house a calcining furnace to process scrap tungsten, with a mezzanine for office space.
- Applicant
- Cronimet Specialty Metals
- Plan type
- Minor preliminary/final land development
- Land use
- industrial
Project history
- 2025-09-16 · #2025-09-18-400-sq-ft-addition-at-cronimet-facili · Minor preliminary/final land development · 18,400 sq ft
Map pin is approximate.
The full picture AI research · Nov 7, 2026
Cronimet Specialty Metals, a metal recycler, plans to add an 18,400 sq ft building to its existing plant in Reynolds Industrial Park, Pymatuning Township, near Greenville. The addition would hold a calcining furnace. This is a high-temperature oven that processes scrap tungsten. A mezzanine (a partial upper floor) would provide office space.
The site is already an operating industrial facility, so the addition would expand an existing plant. It would not create a new one on open land.
The filing is a minor preliminary/final land development plan, a short-form review for small projects on developed sites. It went to the Mercer County Regional Planning Commission in September 2025. No news coverage, opposition, construction notice or building listing was found for it.
What it could mean nearby
- The addition is inside an established industrial park, so it fits the existing industrial setting.
- The records do not give traffic, job-count or utility figures for the project.
- The new building would handle scrap tungsten, so the plant's mix of materials and processes could change. The records give no emissions details.
Where it stands
County records show the plan was filed for county review on 2025-09-16, and nothing found shows a later decision. Typical next steps are the township's own approval of the plan, then building and any required environmental permits, then construction.
- Sep 23, 2025 Mercer County Regional Planning Commission meeting whose minutes reference the Cronimet plan
- Sep 16, 2025 Minor preliminary/final land development plan filed for county review
Who's behind it
Cronimet Specialty Metals USA, Inc. · A U.S. arm of a German stainless steel and specialty metal scrap and raw-materials company, with several North American sites.
Around the web
- September AgendaMercer County Regional Planning Commission · Sep 23, 2025Lists the Cronimet minor preliminary/final land development plan for Pymatuning Township as new business.
- 9-23-2025 MinutesMercer County Regional Planning Commission · Sep 23, 2025Search excerpts of these minutes repeat the project description, but the outcome could not be read.
- Where to Sell?Scrapyard FinderLists Cronimet at 209 Reynolds Industrial Park Rd, Greenville, confirming an operating facility.
Planning terms explained
- Minor land development
- A short-form review for a small addition or change on a property that is already developed.
- Preliminary/final plan
- A single submission that combines the two usual plan approval steps.
- Calcining furnace
- A very hot oven that heats material to drive off water or gases and change its chemical form.
- Mezzanine
- A partial extra floor inside a building, here planned for offices.
Researched by AI from public sources on Nov 7, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The Pymatuning Township supervisors and the Mercer County Regional Planning Commission handle land development plans, and residents can contact the township office or attend public meetings to comment.
In Pennsylvania, Pymatuning Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the Pymatuning Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Pymatuning Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find Pymatuning Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Estimated construction value: $2.4M
- ~184 roofing squares (assumes 1 story)
- ~46 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Cronimet minor land developmentsame area · other · Pymatuning Township · filed 2025-09-23
- 18,400 sq ft addition at Reynolds Industrial Parksame area · 18,400 sq ft non-residential, industrial · Pymatuning Township · filed 2025-09-16
- Edgewood Medical site plan, lot depth modificationsame area · 7,936 sq ft non-residential, office · Pymatuning · filed 2026-05-19
- Edgewood Cath Lab 7,936 sq ft medical buildingsame area · 7,936 sq ft non-residential, institutional · Pymatuning Township · filed 2026-07-21
- Greenville Reynolds Dev Damascus Sitesame area · industrial · Pymatuning Township · filed 2024-11-25
- 7-lot residential subdivision on Woodland Ave.same area · single-family homes · Sharpsville Borough · filed 2025-08-19