Mercer County · Pymatuning Township · #2026-07-edgewood-cath-lab-7-936-sq-ft-medical-bu
Edgewood Cath Lab 7,936 sq ft medical building
Pymatuning Township, PA · 7,936 sq ft non-residential, institutional
In short: Edgewood Cath Lab 7,936 sq ft medical building is an institutional project in Pymatuning Township, Mercer County, PA. It would add 7,936 sq ft of non-residential space. Its estimated construction value is about $2.8M, a rough estimate from its size. As of November 24, 2026, it is in review. Latest record: Preliminary/Final site improvement plan reviewed at a meeting of the county planning commission (July 21, 2026). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.
Usually next: a planning commission recommendation, then a vote by the town's governing body.
About this project
Edgewood Medical Center proposes a 7,936 sq ft building with parking and access in Pymatuning Township. The agenda does not describe the site's existing conditions.
- Applicant
- Edgewood Medical Center
- Plan type
- Preliminary/Final site improvement plan
- Land use
- institutional
Project history
- 2026-07-21 · #2026-07-edgewood-cath-lab-7-936-sq-ft-medical-bu · Preliminary/Final site improvement plan · 7,936 sq ft
Map pin is approximate.
The full picture AI research · Nov 21, 2026
Edgewood Medical Center has proposed a new 7,936-square-foot building in Pymatuning Township, Mercer County. The county item calls it the Edgewood Cath Lab. A cath lab is a room where doctors do heart tests and procedures through a small tube in a blood vessel. The plan also includes parking and access to the site.
The county agenda does not describe what is on the site now. An earlier county item for an "Edgewood Site Plan" in the township involved a lot of about 0.91 acres. It asked for relief from a minimum lot size rule, and the county planners reportedly voted in favor of that request in May 2026. The records do not confirm that it is the same site.
No news coverage, builder page, listing or tenant announcement was found for this building. Nothing found shows construction has started.
What it could mean nearby
- The plan includes new parking and access, so some added medical-visit traffic on the site's road is possible. No traffic study was found.
- A small medical building could bring some health-care jobs and local heart-care services, but no staffing figures were found.
Where it stands
The county planning commission reviewed the preliminary/final site improvement plan on 2026-07-21. The county records found do not show the outcome. Next steps usually include township approval, any state stormwater and driveway permits, and building permits.
- Jul 21, 2026 County planning commission reviewed the preliminary/final site improvement plan for the Edgewood Cath Lab
- May 2026 County planners considered a lot-size modification request for an Edgewood site plan in Pymatuning Township; a favorable vote was reported
Who's behind it
Edgewood Medical Center · The county filing names Edgewood Medical Center as the applicant. No official website or company details were found, and a link to the Hermitage-area surgical hospital of a similar name could not be confirmed.
Around the web
- July AgendaMercer County Regional Planning Commission · Jul 21, 2026Lists the Edgewood Cath Lab preliminary/final plan in Pymatuning Township with a 7,936 sq ft building, parking and access.
- 7-21-26 ZS Minute DRAFTMercer County Regional Planning Commission · Jul 21, 2026Draft minutes list the item, but no vote or conditions could be read.
- May Agenda WebsiteMercer County Regional Planning Commission · May 2026A search summary of this agenda describes an Edgewood site plan modification request for a lot of about 0.91 acres in Pymatuning. The PDF could not be read directly.
- Slides May 2026Mercer County Regional Planning Commission · May 2026A search summary says these slides show a motion to approve the lot-size modification, with the township in favor. The PDF was not opened.
Planning terms explained
- Cath lab
- A medical room where doctors diagnose and treat heart and blood-vessel problems using thin tubes and X-ray imaging.
- Preliminary/Final site improvement plan
- A combined plan showing the building, parking, access and utilities, reviewed in one step instead of two.
- SALDO
- The county's subdivision and land development ordinance, which sets rules for lot sizes and site layout.
- Modification request
- A request to be excused from one rule in the ordinance, such as a minimum lot size.
Researched by AI from public sources on Nov 21, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: Pymatuning Township's local officials and the Mercer County Regional Planning Commission handle the review; residents can contact them or attend public meetings, but no specific hearing notice was found.
In Pennsylvania, Pymatuning Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the Pymatuning Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Pymatuning Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find Pymatuning Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Estimated construction value: $2.8M
- ~39 roofing squares (assumes 2 stories)
- ~19 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Edgewood Medical site plan, lot depth modificationsame area · 7,936 sq ft non-residential, office · Pymatuning · filed 2026-05-19
- Cronimet minor land developmentsame area · other · Pymatuning Township · filed 2025-09-23
- 18,400 sq ft addition at Reynolds Industrial Parksame area · 18,400 sq ft non-residential, industrial · Pymatuning Township · filed 2025-09-16
- 18,400 sq ft addition at Cronimet facilitysame area · 18,400 sq ft non-residential, industrial · Pymatuning Township · filed 2025-09-16
- Greenville Reynolds Dev Damascus Sitesame area · industrial · Pymatuning Township · filed 2024-11-25
- MC Solar final land development plan, West Salem Townshipsame area · other · West Salem Township · filed 2024-09-17