Mercer County · West Salem Township · #2024-09-mc-solar-final-land-development-plan-wes · Solar farms tracker
MC Solar final land development plan, West Salem Township
West Salem Township, PA · other
In short: MC Solar final land development plan, West Salem Township is a development project in West Salem Township, Mercer County, PA. As of November 24, 2026, the public records we track show nothing newer since September 17, 2024. The town may have acted since.
The public records we track show nothing newer in over two years. The town may have acted since: local decisions don't always reach these records.
About this project
Final land development plans for the MC Solar project in West Salem Township are listed for review. The agenda says the plans are complete and include emergency access routes discussed earlier, and that other required permits and approvals are noted on the plans for recording. The agenda does not give the facility's size or location.
Issues raised: Emergency access routes, Other permits and approvals noted on plans for recording
- Plan type
- Final land development
- Land use
- other
Project history
- 2024-09-17 · #2024-09-mc-solar-final-land-development-plan-wes · Final land development
Map pin is approximate.
The full picture AI research · Nov 15, 2026
MC Solar is a solar power project. Its final land development plans were listed for review at a Mercer County planning commission meeting on 2024-09-17. The agenda says the plans are complete and show the emergency access routes discussed earlier. It also says other required permits and approvals are noted on the plans for recording. The agenda does not give the project's size or location.
An online grid-queue listing for "MC Solar I" in Mercer County shows a 50 MW solar project. It lists an expected online date of January 2027. These listings do not name a township, so no source confirms they describe the West Salem plan. A change.org petition also opposes solar farms in West Salem Township in general, citing farmland and ecosystem concerns. It is not tied to this project by name.
No developer page, news story, construction notice or township decision specific to this project was found.
What it could mean nearby
- The agenda says the plans include emergency access routes, so access for emergency vehicles was part of the review.
- Size, location, traffic and stormwater effects cannot be stated because no source gives them for this site.
- West Salem Township has a solar facility ordinance, with a 2026 amendment. It sets local rules for solar facilities.
Where it stands
The final land development plans were reviewed by the county planning commission on 2024-09-17. After final plan approval, the plans are normally recorded and the permits noted on them are obtained before construction. No source found shows whether recording, permits or construction have happened.
- Jan 2027 Expected online date for a 50 MW "MC Solar I" in Mercer County, per queue listings. Not confirmed as the West Salem site.
- Sep 17, 2024 Final land development plans for MC Solar in West Salem Township were reviewed at a county planning commission meeting.
Around the web
- Mercer County Regional Planning CommissionMCRPC · Sep 17, 2024The county planning commission site lists the MC Solar final land development review in West Salem Township.
- MC Solar I (PJM-AE2-285) — Project SummaryInfrasure · Oct 25, 2026A 50 MW solar project in Mercer County has a proposed operation date of January 2027, and the listing shows it under construction. It names no township or developer.
- MC Solar I expected commercial operation January 2027CleanviewThis listing shows a planned 50 MW project in Mercer County with a January 2027 expected online date.
- West Salem Township Ordinance 72A, Solar FacilityMCRPC · May 1, 2026West Salem Township's amended solar ordinance sets local requirements for solar facilities.
- Stop Solar Farms in West Salem Twpchange.orgA petition opposes solar farms in West Salem Township generally and is not specific to MC Solar.
Planning terms explained
- Final land development plan
- The detailed site plan showing what will be built and how, which a municipality and the county review before work begins.
- Recording
- Filing the approved plans with the county as an official record.
- Emergency access routes
- Roads or drives on the site that fire and ambulance vehicles can use.
- MW (megawatt)
- A measure of power output. A solar project's size is usually stated this way.
Researched by AI from public sources on Nov 15, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The Mercer County Regional Planning Commission reviews land development plans, and its meetings are public. The township supervisors handle local approvals, but no hearing date was found.
In Pennsylvania, West Salem Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the West Salem Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the West Salem Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find West Salem Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Final land development plans - MC Solarsame area · other · West Salem Township · filed 2024-09-17
- Dunkin' restaurant at 48 W. Main St., Greenvillesame area · 2,848 sq ft non-residential, restaurant · Greenville Borough · filed 2026-11-17
- 2,848 sq ft Dunkin' building, Greenville Boroughsame area · 2,848 sq ft non-residential, restaurant · Greenville Borough · filed 2026-04-21
- Thiel College athletic and wellness center additionsame area · school · Greenville · filed 2026-05-19
- Greenville Reynolds Dev Damascus Sitesame area · industrial · Pymatuning Township · filed 2024-11-25
- Edgewood Cath Lab 7,936 sq ft medical buildingsame area · 7,936 sq ft non-residential, institutional · Pymatuning Township · filed 2026-07-21