PlannedNearby

Mercer County · West Salem Township · #2024-09-final-land-development-plans-mc-solar · Solar farms tracker

Final land development plans - MC Solar

West Salem Township, PA · other

In short: Final land development plans - MC Solar is a development project in West Salem Township, Mercer County, PA. As of November 24, 2026, it is approved according to web research. Latest record: The county record dated 2024-09-17 describes the final plans as complete and ready for recording, and a search listing shows the project on a November 19, 2024… What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.

Approved The county record dated 2024-09-17 describes the final plans as complete and ready for recording, and a search listing shows the project on a November 19, 2024 review-committee agenda. · web research checked Nov 21, 2026 · source AI research
  1. Proposed
  2. In reviewSep 2024
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: building and stormwater permits; site work often starts within 3 to 12 months.

About this project

Final land development plans for the MC Solar project in West Salem Township, described as complete and ready for recording. The plans include emergency access routes, and other required permits and approvals are noted on them. The agenda does not give the site size or what the land currently is.

Plan type
Final land development
Land use
other

Project history

  • 2024-09-17 · #2024-09-final-land-development-plans-mc-solar · Final land development

County plan review office →

Map pin is approximate.

The full picture AI research · Nov 21, 2026

MC Solar is a planned 50-megawatt solar power plant in West Salem Township, Mercer County. Federal energy data, as shown on interconnection.fyi, lists the owner as MC Solar, LLC and the plant as planned. It would add no homes.

In September 2024 the county planning commission reviewed the final land development plans and described them as complete and ready for recording. The plans show emergency access routes, and other required permits and approvals are noted on them. The county agenda does not give the acreage or say what the land is now. The agenda PDFs and minutes could not be read as text, so those details could not be checked.

No news coverage, developer page or construction notice was found for this site. Grid-queue listings still show it as planned for about January 2027. One listing says the project is under construction, but no other source backs that up.

What it could mean nearby

Where it stands

County records show the final land development plans were reviewed in September 2024 and described as complete and ready for recording. Recording the plans and getting building and other permits usually follow, and no source shows whether those steps have happened. The November 2024 commission minutes, which the fact-check says record the approval vote, could not be read as text, so that date is not confirmed here. Note: InfraSure's project summary calls the project under construction, but its plant page and the other queue listings show it as planned, and no local source confirms any work on site.

Who's behind it

MC Solar, LLC · The project-specific company listed as owner and operator in federal energy data; no parent company or website was found.

Around the web

Planning terms explained
Final land development plan
The detailed site plan a project must have approved before it can be recorded and built.
Recording
Filing the approved plans with the county as a permanent public record.
Nameplate capacity (MW)
The maximum power output the plant is built for, in megawatts.
PJM interconnection queue
The regional grid operator's waiting list for power plants that want to connect to the grid.
Solar PV
Photovoltaic panels that turn sunlight directly into electricity.

Researched by AI from public sources on Nov 21, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The Mercer County Regional Planning Commission reviewed the plans, and its meetings are public (see mcrpc.com). West Salem Township supervisors handle township permits and the solar ordinance.

In Pennsylvania, West Salem Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

Find West Salem Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Not enough detail to estimate.

Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →

More projects nearby

See everything nearby on a map →