Mercer County · Lackawannock Township · #2025-08-mercer-middlesex-solar-facility-nych-rd · Solar farms tracker
Mercer Middlesex solar facility, Nych Rd.
Nych Rd., Lackawannock Township, PA · other · 157.0 acres
In short: Mercer Middlesex solar facility, Nych Rd. is a development project in Lackawannock Township, Mercer County, PA. The site is 157.0 acres. As of November 24, 2026, it is in review. Latest record: Preliminary land development reviewed at a meeting of the county planning commission (August 19, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.
Usually next: a planning commission recommendation, then a vote by the town's governing body.
About this project
Preliminary plan for a solar energy facility with four solar arrays and supporting infrastructure on Nych Rd. The site is 157 acres, with 46.6 acres to be disturbed.
- Plan type
- Preliminary land development
- Land use
- other
Project history
- 2025-08-19 · #2025-08-mercer-middlesex-solar-facility-nych-rd · Preliminary land development
Map pin is approximate.
The full picture AI research · Nov 7, 2026
A solar energy facility is proposed on Nych Rd. in Lackawannock Township, Mercer County. It would sit on a 157-acre site and have four groups of solar panels (arrays) plus supporting equipment. About 46.6 acres would be disturbed by construction.
The county planning commission's August 2025 agenda lists the plan. The plan is a preliminary land development plan, which is an early formal review of the layout.
No developer website, news coverage, township minutes, state stormwater permit record or sign of construction was found. Nothing found shows who owns the project or whether it has been approved, started or opposed.
What it could mean nearby
- Nych Rd. is a dead-end road, according to a 2024 township culvert-project page, so construction traffic would likely use that single route.
- About 46.6 of the 157 acres would be disturbed, so most of the site would stay undeveloped.
- Solar arrays generally add few permanent jobs and little traffic once built. The records do not give a power output or a connection point.
Where it stands
The county records show a preliminary land development plan filed for county review on 2025-08-19. After county review, the township usually decides on the plan, and a state stormwater permit and construction permits would follow before work begins.
- Aug 19, 2025 Preliminary land development plan filed and placed on the county planning commission's review agenda
Around the web
- August AgendaMercer County Regional Planning Commission · Aug 19, 2025The agenda for the committee meeting of August 19, 2025 lists the preliminary plan for the Mercer Middlesex solar facility on Nych Rd.
- Nych Road Emergency Culvert Replacement ProjectIAG Consulting · Mar 1, 2024Describes Nych Rd. in Lackawannock Township as a dead-end road with no other route in or out.
Planning terms explained
- Preliminary land development plan
- A detailed early plan showing how a site would be built, which local officials review before final approval.
- Solar array
- A group of solar panels mounted together to generate electricity.
- Disturbed acres
- The part of the site where soil will be graded, dug or cleared during construction.
- Stormwater permit
- A state permit that controls how rain runoff and erosion are managed on larger construction sites.
Researched by AI from public sources on Nov 7, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: Residents can contact the Lackawannock Township supervisors, who normally decide on land development plans, and the Mercer County Regional Planning Commission, which reviews the plan and holds public meetings.
In Pennsylvania, Lackawannock Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the Lackawannock Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Lackawannock Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find Lackawannock Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Solar facility with four arrays off Nych Roadsame area · other · Lackawannock Township · filed 2025-09-16
- Solar facility off Nych Road (4 arrays)same area · other · Lackawannock Township · filed 2025-09-16
- Preliminary plan, Project Cakesame area · warehouse & storage · East Lackawannock Township · filed 2025-03-25
- Quality Bridge and Fabrication industrial facilitysame area · industrial · Shenango Township · filed 2026-06-16
- Cold storage facility, Wilmington Townshipsame area · warehouse & storage · Wilmington Township · filed 2026-01-14
- Varga cold storage facility, Wilmington Townshipsame area · warehouse & storage · Wilmington Township · filed 2026-01-14