PlannedNearby

Mercer County · Lackawannock Township · #2025-09-solar-facility-with-four-arrays-off-nych · Solar farms tracker

Solar facility with four arrays off Nych Road

Off Nych Road, Lackawannock Township, PA · other · 46.6 acres

In short: Solar facility with four arrays off Nych Road is a development project in Lackawannock Township, Mercer County, PA. The site is 46.6 acres. As of November 24, 2026, it is in review. Latest record: Final land development reviewed at a meeting of the county planning commission (September 16, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

In review Final land development reviewed at a meeting of the county planning commission · Sep 16, 2025 · source
  1. Proposed
  2. In reviewSep 2025
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: a planning commission recommendation, then a vote by the town's governing body.

About this project

A solar energy facility with four separate solar arrays and associated infrastructure is proposed. Access would be from Nych Road, with about 46.6 acres of ground disturbance.

Plan type
Final land development
Land use
other

Project history

  • 2025-09-16 · #2025-09-solar-facility-with-four-arrays-off-nych · Final land development

County plan review office →

Map pin is approximate.

The full picture AI research · Nov 7, 2026

A solar energy facility is proposed off Nych Road in Lackawannock Township, Mercer County. It would have four separate solar arrays and the equipment that goes with them. About 46.6 acres of ground would be disturbed. The project appears to be listed publicly as the Mercer Middlesex Solar Facility, on a larger parcel of roughly 157 acres.

A county planning agenda from August 2025 listed the preliminary land development plan. County records show a final land development plan was filed for county review on 2025-09-16. Vehicles would reach the site from Nych Road.

No news coverage, opposition, township approval or construction notice was found. No developer was identified. No evidence of work on the ground turned up.

What it could mean nearby

Where it stands

The final land development plan was filed for county review on 2025-09-16, and no later decision was found. Review by the county and township usually comes first, then township action on the plan, then site and stormwater permits and construction.

Around the web

Planning terms explained
Land development plan
A detailed site plan showing what will be built, where, and how it connects to roads and utilities.
Final land development
The last plan stage before approval, with full engineering detail.
Ground disturbance
The area of land that will be cleared, graded or dug during construction.
Solar array
A group of solar panels installed together to generate electricity.

Researched by AI from public sources on Nov 7, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The Lackawannock Township supervisors normally decide on land development plans, with advice from the Mercer County Regional Planning Commission; comments can be made at their public meetings.

In Pennsylvania, Lackawannock Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

Find Lackawannock Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Not enough detail to estimate.

Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →

More projects nearby

See everything nearby on a map →