Solar facility with four arrays off Nych Road
Off Nych Road, Lackawannock Township, PA · other · 46.6 acres
In short: Solar facility with four arrays off Nych Road is a development project in Lackawannock Township, Mercer County, PA. The site is 46.6 acres. As of November 24, 2026, it is in review. Latest record: Final land development reviewed at a meeting of the county planning commission (September 16, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.
Usually next: a planning commission recommendation, then a vote by the town's governing body.
About this project
A solar energy facility with four separate solar arrays and associated infrastructure is proposed. Access would be from Nych Road, with about 46.6 acres of ground disturbance.
- Plan type
- Final land development
- Land use
- other
Project history
- 2025-09-16 · #2025-09-solar-facility-with-four-arrays-off-nych · Final land development
Map pin is approximate.
The full picture AI research · Nov 7, 2026
A solar energy facility is proposed off Nych Road in Lackawannock Township, Mercer County. It would have four separate solar arrays and the equipment that goes with them. About 46.6 acres of ground would be disturbed. The project appears to be listed publicly as the Mercer Middlesex Solar Facility, on a larger parcel of roughly 157 acres.
A county planning agenda from August 2025 listed the preliminary land development plan. County records show a final land development plan was filed for county review on 2025-09-16. Vehicles would reach the site from Nych Road.
No news coverage, opposition, township approval or construction notice was found. No developer was identified. No evidence of work on the ground turned up.
What it could mean nearby
- Access would be from Nych Road, so any construction traffic would use that road.
- About 46.6 acres would be disturbed, so stormwater and erosion controls would matter during construction.
- Solar arrays usually generate little daily traffic or noise once built, but no source for this site confirms details.
Where it stands
The final land development plan was filed for county review on 2025-09-16, and no later decision was found. Review by the county and township usually comes first, then township action on the plan, then site and stormwater permits and construction.
- Sep 16, 2025 Final land development plan filed for county review
- Aug 2025 Preliminary land development plan for the Nych Rd. solar facility listed on the county regional planning commission agenda
Around the web
- August AgendaMercer County Regional Planning Commission · Aug 1, 2025Lists the preliminary land development plan for the Nych Rd. solar facility, with four arrays, 46.6 disturbed acres and a parcel of about 157 acres.
Planning terms explained
- Land development plan
- A detailed site plan showing what will be built, where, and how it connects to roads and utilities.
- Final land development
- The last plan stage before approval, with full engineering detail.
- Ground disturbance
- The area of land that will be cleared, graded or dug during construction.
- Solar array
- A group of solar panels installed together to generate electricity.
Researched by AI from public sources on Nov 7, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The Lackawannock Township supervisors normally decide on land development plans, with advice from the Mercer County Regional Planning Commission; comments can be made at their public meetings.
In Pennsylvania, Lackawannock Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the Lackawannock Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Lackawannock Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find Lackawannock Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Mercer Middlesex solar facility, Nych Rd.same area · other · Lackawannock Township · filed 2025-08-19
- Solar facility off Nych Road (4 arrays)same area · other · Lackawannock Township · filed 2025-09-16
- Preliminary plan, Project Cakesame area · warehouse & storage · East Lackawannock Township · filed 2025-03-25
- Quality Bridge and Fabrication industrial facilitysame area · industrial · Shenango Township · filed 2026-06-16
- Cold storage facility, Wilmington Townshipsame area · warehouse & storage · Wilmington Township · filed 2026-01-14
- Varga cold storage facility, Wilmington Townshipsame area · warehouse & storage · Wilmington Township · filed 2026-01-14