PlannedNearby

Essex County · Cedar Grove Township · #0000-02-0032.3

5-lot residential subdivision on Weaver St

Weaver St & Tolstoi Pl, Cedar Grove Township, NJ · 5 homes, single-family homes

In short: 5-lot residential subdivision on Weaver St is a single-family home development at Weaver St & Tolstoi Pl in Cedar Grove Township, Essex County, NJ. It would add 5 homes. Its estimated construction value is about $2.8M, a rough estimate from its size. As of November 24, 2026, it is approved according to web research. Latest record: County records show NJDEP freshwater wetlands permit 0000-02-0032.3 approved on 2026-10-05, and no source found shows later building permits or construction. What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.

Approved County records show NJDEP freshwater wetlands permit 0000-02-0032.3 approved on 2026-10-05, and no source found shows later building permits or construction. · web research checked Nov 11, 2026 · source AI research
  1. Proposed
  2. In reviewApr 2025
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: building and stormwater permits; site work often starts within 3 to 12 months.

About this project

A five-lot residential subdivision at Weaver Street and Tolstoi Place in Cedar Grove Township, with stormwater management and an isolated wetland area.

Official description: A five-lot subdivision with isolated wetlands and stormwater management.

Plan type
State environmental permit application (NJDEP)
Land use
Subdivision
Status
approved

Project history

  • 2026-10-05 · #0000-02-0032.3 · State environmental permit application (NJDEP) · 5 lots/units
  • 2026-10-05 · NJDEP freshwater wetlands permit 0000-02-0032.3: approved · source
  • 2025-04-28 · NJDEP freshwater wetlands permit 0000-02-0032.2: application filed · source
  • 2025-04-28 · NJDEP freshwater wetlands permit 0000-02-0032.3: application filed · source

County plan review office →

The full picture AI research · Nov 11, 2026

A developer has proposed splitting land at Weaver Street and Tolstoi Place in Cedar Grove Township into five lots for single-family homes. County records say the plan includes stormwater controls, meaning basins or similar features that hold and slow runoff. They also mention an isolated wetland area on the site.

The state environmental agency (NJDEP) approved a freshwater wetlands permit for the site on 2025-10-05, according to the county record. That is a state environmental approval. It is not a township building permit.

No news coverage, township agenda or minutes, builder page, or home listings for this project were found. Nothing found shows that construction has started. Nearby Tolstoi Place lots appear in property records as vacant land and as existing homes.

What it could mean nearby

Where it stands

The latest county record shows the state wetlands permit approved on 2026-10-05. The township's own subdivision approval was not found online. After that, building and site permits would usually be sought, followed by construction.

Around the web

Planning terms explained
Subdivision
Dividing one piece of land into separate lots that can be built on or sold.
Freshwater wetlands permit
A state permit that controls building on or near wetlands.
Isolated wetland
A wetland that is not connected to a stream or other water body.
Stormwater management
Features such as basins that collect and slow rainwater runoff from a development.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 11, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: Township subdivision applications are normally heard by the Cedar Grove Planning Board, so residents can ask the township's planning office about any hearing. No hearing notice for this project was found.

In New Jersey, the Cedar Grove Township planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.

Find Cedar Grove Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Estimated construction value: $2.8M

Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →

More projects nearby

See everything nearby on a map →