Essex County · Livingston Township · #0710-24-0004.1 · Warehouses and distribution centers tracker

Industrial warehouse development

2 Peach Tree Hill Road, Livingston Township, NJ · warehouse & storage

In short: Industrial warehouse development is a warehouse and storage development at 2 Peach Tree Hill Road in Livingston Township, Essex County, NJ. As of November 24, 2026, it is approved. Latest record: Official record (dspace.njstatelib.org): Decision: Approved 09/14/2026 (September 14, 2026). What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.

Approved Official record (dspace.njstatelib.org): Decision: Approved 09/14/2026 · Sep 14, 2026 · source
  1. Proposed
  2. In reviewMay 2026
  3. ApprovedSep 2026
  4. Permitted
  5. Under construction
  6. Completed

Usually next: building and stormwater permits; site work often starts within 3 to 12 months.

About this project

Redevelopment of 2 Peach Tree Hill Road in Livingston Township as an industrial warehouse development with stormwater management improvements.

Official description: Redevelopment of the site with an industrial warehouse development and stormwater management improvements.

Applicant
Atlas VI Peach Tree LLC
Plan type
State environmental permit application (NJDEP)
Land use
Warehouse & storage
Status
approved

Project history

  • 2026-09-14 · #0710-24-0004.1 · State environmental permit application (NJDEP)
  • 2026-09-14 · NJDEP flood hazard permit 0710-24-0004.1: approved · source
  • 2026-05-18 · NJDEP flood hazard permit 0710-24-0004.1: application filed · source

County plan review office →

The full picture AI research · Nov 22, 2026

The proposal is to redevelop 2 Peach Tree Hill Road in Livingston Township as an industrial warehouse. The plan includes stormwater management improvements, meaning drainage features that handle rain runoff from the site. The state environmental bulletin lists the applicant as Atlas VI Peach Tree LLC.

The state environmental agency (NJDEP) approved the flood hazard permit on Sep 14, 2026. The same bulletin entry also lists two wetlands approvals: a freshwater wetlands general permit for drainage outfalls, and a waiver for work near wetlands. The application was filed May 18, 2026.

A paid development tracker describes a roughly 31-acre Peachtree Hill redevelopment area that shifts from office use to light industrial and logistics. It also mentions a former data center building at this address. That tracker could not be opened or verified. No news, township minutes, builder page, listing or tenant announcement was found for this site, so there is no confirmed sign of construction.

What it could mean nearby

Where it stands

The state environmental agency approved the flood hazard permit on Sep 14, 2026, and the same bulletin entry lists two related wetlands approvals. No source shows whether construction has started; building permits and local site plan steps would normally follow. Note: The source is a state environmental (NJDEP) bulletin, not a county record. A page note says it is dated Oct 7, 2026, and the Sep 14, 2026 date is the decision date, not the bulletin date.

Who's behind it

Atlas VI Peach Tree LLC · The company is the applicant on the state permit filing. A paid tracker links an Atlas entity to the wider redevelopment area, but that is unverified, and no company website was found.

Around the web

Planning terms explained
Flood hazard permit
A state permit required for building in or near flood-prone areas and streams.
Freshwater wetlands general permit
A state permit allowing limited, low-impact work in wetlands, such as drainage outfalls.
Transition area waiver
State approval to build in the buffer zone next to wetlands.
Stormwater management
Systems that collect, slow and clean rain runoff from a site.
Redevelopment area
An area a town designates for rebuilding under special planning rules.

Researched by AI from public sources on Nov 22, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: Local site plan and redevelopment steps would go through the Livingston Township Planning Board and Township Council, but no hearing notice was found.

In New Jersey, the Livingston Township planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.

Find Livingston Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Not enough detail to estimate.