PlannedNearby

Mercer County · East Windsor Township · #1101-18-0006.1

Residential development with wetland fill and road work

641 N Main St, East Windsor Township, NJ · subdivision (use not stated)

In short: Residential development with wetland fill and road work is a subdivision at 641 N Main St in East Windsor Township, Mercer County, NJ. As of November 24, 2026, it is approved according to web research. Latest record: The county record shows the state wetlands permit approved on 2025-01-09, and no source found shows construction, sales or leasing. What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.

Approved The county record shows the state wetlands permit approved on 2025-01-09, and no source found shows construction, sales or leasing. · web research checked Nov 22, 2026 · source AI research
  1. Proposed
  2. In reviewJan 2021
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: building and stormwater permits; site work often starts within 3 to 12 months.

About this project

A residential development at 641 North Main Street in East Windsor Township, requiring wetland fill, an access road through a wetland buffer, widening of North Main Street and a stormwater inlet and pipe.

Official description: A residential development at 641 N Main St requires wetland fill, an access road through a wetland buffer, N Main Street widening, and a stormwater inlet and pipe.

Applicant
Kaplan @ Tacony LP
Plan type
State environmental permit application (NJDEP)
Land use
Subdivision
Status
approved

Project history

  • 2025-01-09 · #1101-18-0006.1 · State environmental permit application (NJDEP)
  • 2025-01-09 · NJDEP freshwater wetlands permit 1101-18-0006.1: approved · source
  • 2021-01-12 · NJDEP freshwater wetlands permit 1101-18-0006.1: application filed · source

County plan review office →

The full picture AI research · Nov 22, 2026

The developer, Kaplan at Tacony LP, proposes a residential community at 641 North Main Street, less than a mile north of downtown Hightstown. A 2021 news report describes two linked neighborhoods. Camelot at East Windsor would have 295 apartments in 12 buildings, 65 of them affordable. Amaranth at East Windsor would have 111 age-restricted homes in three buildings. Each neighborhood would have its own clubhouse. The land was mostly farmed in the past.

The state wetlands permit covers filling some wetland, building an access road through a wetland buffer, widening North Main Street, and adding a stormwater inlet and pipe. The state approved that permit on 2025-01-09, after the application was filed in 2021.

No leasing page, listing, groundbreaking notice or news report showing construction was found. A May 2022 trade article said Kaplan was underway on a second Amaranth in East Windsor. That wording is vague and doesn't confirm that building has started. The unit counts come from the 2021 hearing notice and may have changed.

What it could mean nearby

Where it stands

The state wetlands permit was approved on 2025-01-09. The 2021 news report shows Planning Board site plan approval was being sought, and no decision on that was found. Construction normally follows once all local and state approvals and building permits are in place. Note: The county record lists the type as subdivision with the use not stated. A 2021 news report describes 295 apartments and 111 age-restricted homes, so the use is residential.

Who's behind it

Kaplan at Tacony LP (Kaplan Companies) · A central New Jersey developer behind other Camelot rental and Amaranth age-restricted communities, including Amaranth at North Brunswick.

Around the web

Planning terms explained
Freshwater wetlands permit
A state permit that allows building in or next to wetlands under set conditions.
Wetland buffer
A strip of land beside a wetland that is protected to keep the wetland healthy.
Site plan approval
A local board's approval of a project's layout, including buildings, roads, parking and drainage.
Variance
Permission to depart from a local zoning rule.
Inclusionary development
A project that sets aside some homes as affordable housing.

Researched by AI from public sources on Nov 22, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The East Windsor Township Planning Board handles site plan approvals at public meetings, and residents can comment during the hearing. This site's current local status wasn't found, so check the township's planning board agendas.

In New Jersey, the East Windsor Township planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.

Find East Windsor Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Not enough detail to estimate.

Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →

More projects nearby

See everything nearby on a map →