Middlesex County · Piscataway Township · #1217-19-0001.1

Age-restricted residential development

S Washington Ave, Piscataway Township, NJ · senior living

In short: Age-restricted residential development is a senior living development at S Washington Ave in Piscataway Township, Middlesex County, NJ. As of November 24, 2026, it is approved according to web research. Latest record: A transcript of the October 8, 2025 Planning Board meeting shows a unanimous roll-call vote to approve the application with conditions, with the written… What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.

Approved A transcript of the October 8, 2025 Planning Board meeting shows a unanimous roll-call vote to approve the application with conditions, with the written resolution due the following month. · web research checked Nov 10, 2026 · source AI research
  1. Proposed
  2. In reviewJan 2026
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: building and stormwater permits; site work often starts within 3 to 12 months.

About this project

An age-restricted residential development has been approved on South Washington Avenue in Piscataway Township. It requires freshwater wetlands general permits and a transition area waiver.

Official description: An age-restricted residential development is proposed, requiring freshwater wetlands general permits and a transition area waiver.

Applicant
Fields Of Corn LLC
Plan type
State environmental permit application (NJDEP)
Land use
Senior living
Status
application

Project history

  • 2026-01-08 · #1217-19-0001.1 · State environmental permit application (NJDEP)
  • 2026-01-08 · NJDEP freshwater wetlands permit 1217-19-0001.1: application filed · source

County plan review office →

The full picture AI research · Nov 10, 2026

A developer plans an age-restricted (55-and-older) community on about 43 acres of mostly vacant land on South Washington Avenue. The plan has 190 senior apartments in four three- to four-story buildings, with an 8,000-square-foot clubhouse. It also has 39 detached senior homes on about 9 acres, reached from an extension of Carol Lane. Some of the units are set aside as affordable housing.

Much of the site is wetlands or sits under a power-line easement, so only about 22 acres can be built on. That is why state wetlands permits and a transition-area waiver are needed. The township named the land a redevelopment area in 2014. The Planning Board approved the site plan and the subdivision into 45 lots on October 8, 2025. No sign of construction or sales was found online.

What it could mean nearby

Where it stands

The Planning Board approved the site plan and subdivision on October 8, 2025, and the county filing still shows the state wetlands permit application as under review as of January 2026. Next steps are the state wetlands decision, then construction permits. The outcome of the state permit was not found. Note: The county page shows the project as still in review, but the Planning Board transcript shows local approval in October 2025. The state wetlands permit may still be pending, and a press report of 234 units differs from the 229 homes in the hearing testimony.

Who's behind it

1700 South Washington Avenue Investments LLC · The applicant is a North Brunswick-based company that bought the land from Fields of Corn LLC. No company website or other projects were found.

Around the web

Planning terms explained
Age-restricted
Housing limited to residents of a minimum age, typically 55 and older.
Redevelopment plan
A township-adopted set of rules for how a designated area may be rebuilt.
Major subdivision
Dividing land into several new lots, here 45 lots.
Freshwater wetlands general permit
A state permit allowing limited work in or near wetlands.
Transition area waiver
State permission to build within the protective buffer next to wetlands.

Researched by AI from public sources on Nov 10, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The Planning Board has already acted, so the remaining public step is the NJDEP wetlands permit review; residents can contact NJDEP or the Piscataway Planning Board office for details.

In New Jersey, the Piscataway Township planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.

Find Piscataway Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Not enough detail to estimate.