Northumberland County · Washington Township · #2026-03-39-89-acre-land-development-washington-t
39.89-acre land development, Washington Township
Washington Township, PA · other · 39.9 acres
In short: 39.89-acre land development, Washington Township is a development project in Washington Township, Northumberland County, PA. The site is 39.9 acres. As of November 24, 2026, it is in review. Latest record: Final land development filed for county review (March 16, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.
Usually next: a planning commission recommendation, then a vote by the town's governing body.
About this project
Washington Township is reviewing a final land development covering 39.89 acres, submitted by Elam Smucker Shop. The agenda does not describe the proposed buildings or the land's current use.
- Applicant
- Elam Smucker Shop
- Engineer / designer
- Nye Consulting Services, Inc.
- Plan type
- Final land development
- Land use
- other
Project history
- 2025-03-16 · #2026-03-39-89-acre-land-development-washington-t · Final land development
Map pin is approximate.
The full picture AI research · Nov 12, 2026
Washington Township, in Northumberland County, is reviewing a final land development plan for a 39.89-acre site. Elam Smucker Shop filed the plan, and Nye Consulting Services, Inc. is also named on the filing. The county filing is dated March 16, 2025.
The county agenda doesn't say what would be built, how big the buildings would be, or how the land is used now. The project type is listed only as "Other." "Final" land development is the last plan stage. It follows earlier sketch or preliminary stages that the records don't show.
Six searches covered the developer name, the engineering firm, the township, the acreage and general news. They found no news coverage, developer website, listings, township minutes or permits that clearly match this site. Nothing shows whether work has started.
Where it stands
The county shows the plan as under review, filed on 2025-03-16. After review, the township supervisors normally vote to approve or deny the plan. If it is approved, building and stormwater permits usually follow before construction starts.
- Mar 16, 2025 Final land development filed for county review
Who's behind it
Elam Smucker Shop
Around the web
- Northumberland County planning commission agenda feedNorthumberland County, PA · Mar 16, 2025This is the county record of the filing. The feed shows only agenda and minutes titles and gives no project details.
Planning terms explained
- Final land development
- The last plan stage, where the township checks that detailed site plans meet local rules before approving construction.
- Land development
- A plan to build or change structures or site layout on a parcel. It is broader than dividing land into lots.
- Stormwater permit
- State or local approval of how rain runoff from a construction site will be managed.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 12, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The Washington Township supervisors and planning commission usually handle land development plans, and comments can typically be given at their public meetings. Residents can ask the township office for meeting dates.
In Pennsylvania, Washington Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the Washington Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Washington Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find Washington Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Final land development, Washington Townshipsame area · other · Washington Township · filed 2025-03-16
- 57.5-acre minor subdivision in Washington Twpsame area · subdivision (use not stated) · Washington Township · filed 2025-04-14
- Add-on subdivision, Washington Townshipsame area · lot line change · Washington Township · filed 2025-09-22
- Add-on subdivision, Washington Twpsame area · lot line change · Washington Township · filed 2025-09-02
- Final land development, 78.51 acres (Washington Twp)same area · other · Washington Township · filed 2024-06-07
- 32.98-acre add-on subdivision, Washington Twpsame area · lot line change · Washington Township · filed 2024-10-16