Northumberland County · Washington Township · #925-094
Add-on subdivision, Washington Twp
Washington Township, PA · lot line change · 57.3 acres
In short: Add-on subdivision, Washington Twp is a lot line change in Washington Township, Northumberland County, PA. The site is 57.3 acres. As of November 24, 2026, it is in review. Latest record: Final add-on subdivision filed for county review (September 2, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.
Usually next: a planning commission recommendation, then a vote by the town's governing body.
About this project
A 57.33-acre add-on subdivision in Washington Township, submitted by Benjamin Fisher. The agenda does not describe the lot layout or current use.
- Engineer / designer
- Zeigler Surveying, LLC
- Plan type
- Final add-on subdivision
- Land use
- lot-line-change
Project history
- 2025-09-02 · #925-094 · Final add-on subdivision
Map pin is approximate.
The full picture AI research · Nov 7, 2026
A landowner in Washington Township, Northumberland County, has filed a plan to move a property line. The plan involves a 57.33-acre piece of land. This kind of "add-on" subdivision normally moves land from one owner to a neighboring owner. It does not create a new building lot. The county agenda does not say how the land is laid out or how it is used now.
A later county planning agenda, for January 27, 2026, lists the same 57.33-acre plan as a final add-on subdivision. That agenda shows Zeigler Surveying, LLC as the consultant. No minutes, vote, or approval record for this item was found.
No developer website, news story, listing, construction notice, or stormwater permit was found for this site. Nothing found shows any building or site work.
What it could mean nearby
- Add-on subdivisions usually only move land between neighbors, so no new homes, traffic, or utility demand is shown in the records.
- The records do not show any building plans, so no change to roads, schools, or open space is indicated.
Where it stands
The county records show a final add-on subdivision filed for county review on 2025-09-02. A county planning agenda dated January 27, 2026 lists the plan again. No approval or recording was found. After review, the plan is usually approved by the county and township and then recorded with the county.
- Jan 27, 2026 The county planning commission agenda lists the 57.33-acre final add-on subdivision (agenda shows a 1-21-26 submission date)
- Sep 2, 2025 Final add-on subdivision filed for county review
Around the web
- Northumberland County Planning Commission agenda, January 27, 2026Northumberland County, PA · Jan 27, 2026Lists the Washington Township, 57.33-acre Final Add-on Subdivision with Zeigler Surveying, LLC as consultant.
Planning terms explained
- Add-on subdivision
- A change that transfers land from one owner to an adjoining owner's parcel instead of creating a new building lot.
- Lot line change
- A change to the boundary between neighboring properties.
- Final plan
- The last detailed version of a subdivision plan, submitted for formal approval before it is recorded.
Researched by AI from public sources on Nov 7, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The Northumberland County Planning Commission reviews the plan at its public meetings, and the Washington Township supervisors act on it locally. Residents can contact either body or attend those meetings.
In Pennsylvania, Washington Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the Washington Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Washington Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find Washington Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Add-on subdivision, Washington Townshipsame area · lot line change · Washington Township · filed 2025-09-22
- 57.5-acre minor subdivision in Washington Twpsame area · subdivision (use not stated) · Washington Township · filed 2025-04-14
- 39.89-acre land development, Washington Townshipsame area · other · Washington Township · filed 2025-03-16
- Final land development, Washington Townshipsame area · other · Washington Township · filed 2025-03-16
- Keim Properties 78.53-acre final minor subdivisionsame area · subdivision (use not stated) · Washington Township · filed 2025-03-18
- 32.98-acre add-on subdivision, Washington Twpsame area · lot line change · Washington Township · filed 2024-10-16