Schuylkill County · Schuylkill County (town not stated) · #2024-08-fuel-up-miners-car-wash-lot-annexation-a
Fuel-Up Miners car wash lot annexation and LD
Schuylkill County (town not stated), PA · retail & commercial
In short: Fuel-Up Miners car wash lot annexation and LD is a retail and commercial development in Schuylkill County (town not stated), PA. As of November 24, 2026, the public records we track show nothing newer since August 14, 2024. The town may have acted since.
The public records we track show nothing newer in over two years. The town may have acted since: local decisions don't always reach these records.
About this project
A lot annexation and land development plan for a Fuel-Up Miners car wash. The agenda grants an extension of the Planning Commission's decision but gives no site size or details.
- Plan type
- Lot annexation and land development (decision extended to Dec 9, 2024)
- Land use
- retail
Project history
- 2024-08-14 · #2024-08-fuel-up-miners-car-wash-lot-annexation-a · Lot annexation and land development (decision extended to Dec 9, 2024)
Map pin is approximate.
The full picture AI research · Nov 16, 2026
A developer has proposed a small car wash with two bays and four vacuum stalls. County planning records and meeting minutes place it in Minersville Borough, and it would be tied to the Fuel Up convenience and fuel station there. The plan combines lot boundaries (an annexation) with a land development plan, which is the site layout review.
In mid-2024 the owner cut the number of bays to two so the building could keep a 10-foot buffer on each side. The county Planning Commission then kept pushing back its decision date. The 2024-08-14 record extended it to Dec 9, 2024. Later agendas show further extensions into 2025.
No news coverage, developer page, business listing or construction record was found. The site's current condition is unknown. The records read did not give a site size.
What it could mean nearby
- The plan has two wash bays and four vacuum areas, so it is a small, car-oriented use that would add customer trips at an existing fuel station.
- The owner reduced the bay count to keep side buffers, which suggests the lot is tight and next to other properties.
- Job counts, traffic studies and stormwater details were not found in the sources reviewed.
Where it stands
The county Planning Commission was still extending its decision date as of the 2025 agendas found, and no approval, denial or withdrawal was found. After review, a plan like this normally gets a decision, then conditions are met and permits follow before construction. Note: The county summary says the municipality is not stated and that records stop in August 2024, but the Planning Commission minutes and agendas place the plan in Minersville Borough and show extensions into 2025.
- May 2025 County agenda still lists the Minersville Fuel Up land development plan under extensions of time
- Jan 8, 2025 Extended decision date reached for the preliminary land development plan (KH Holdings LLC listed)
- Dec 9, 2024 Decision deadline set by the August 2024 extension
- Aug 14, 2024 Planning Commission extended its decision on the lot annexation and land development
- Jul 15, 2024 Minutes note the owner reduced the plan to 2 car wash bays; decision moved to Sept 11, 2024
Who's behind it
KH Holdings LLC · Listed as the applicant on the January 2025 Planning Commission minutes, according to search-result summaries; nothing further about the company was found.
Around the web
- Planning Commission MeetingsSchuylkill County · Aug 14, 2024Index of county Planning Commission agendas and minutes, including the August 2024 extension.
- Planning Commission Minutes, July 2024Schuylkill County · Jul 15, 2024Per search-result summary, the plan was cut to two bays and the decision moved to September 2024.
- Planning Commission Minutes, January 2025Schuylkill County · Jan 8, 2025Per search-result summary, the plan was listed again as a preliminary land development plan for KH Holdings LLC.
- Planning Commission Agenda Package, May 2025Schuylkill County · May 2025Per search-result summary, the Minersville Fuel Up plan was still under an extension of time.
Planning terms explained
- Lot annexation
- Adding land from one lot to a neighboring lot, so the two become one larger parcel.
- Land development plan
- A site plan showing the buildings, parking, drainage and access that the reviewing bodies check against local rules.
- Extension of time
- An agreed delay of the deadline for a board to decide, usually so the applicant can answer review comments.
- Buffer
- A strip of open ground kept between a building and the property line.
Researched by AI from public sources on Nov 16, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The Schuylkill County Planning Commission reviews the plan at its public monthly meetings, and Minersville Borough would handle its own local approvals.
In Pennsylvania, the municipality decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the the municipality planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the the municipality manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find the municipality's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Solar project land development (extension)same area · other · Schuylkill County (town not stated) · filed 2024-09-11
- East Mill Street plan time extension, Pine Grovesame area · other · Pine Grove Borough · filed 2026-06-10
- Major subdivision decision extensionsame area · subdivision (use not stated) · Schuylkill County (town not stated) · filed 2024-06-12
- Major subdivision (extension of conditional final)same area · subdivision (use not stated) · Schuylkill County (town not stated) · filed 2024-03-13
- Kurtz Solar Project land development (extension)same area · industrial · Schuylkill County (town not stated) · filed 2024-07-15
- Ashland Solar land development plan (extension)same area · other · Schuylkill County (town not stated) · filed 2024-03-13