Schuylkill County · Schuylkill County (town not stated) · #2024-07-kurtz-solar-project-land-development-ext · Solar farms tracker
Kurtz Solar Project land development (extension)
Schuylkill County (town not stated), PA · industrial
In short: Kurtz Solar Project land development (extension) is an industrial development in Schuylkill County (town not stated), PA. As of November 24, 2026, it is approved according to web research. Latest record: The county's May 2026 Planning Commission minutes, as summarized in search results (the PDF could not be read), say the final land development plan got… What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.
Usually next: building and stormwater permits; site work often starts within 3 to 12 months.
About this project
Time extension for the Kurtz Solar Project preliminary/final land development plans. The Commission extended its decision until its September 11, 2024 meeting.
- Plan type
- Preliminary/final land development (time extension)
- Land use
- other
Project history
- 2024-07-15 · #2024-07-kurtz-solar-project-land-development-ext · Preliminary/final land development (time extension)
Map pin is approximate.
The full picture AI research · Nov 24, 2026
The Kurtz Solar Project is a proposed solar power farm in Schuylkill County, Pennsylvania. County planning records place it in Washington Township, in an agricultural zone. The records name CVE North America as the applicant. The project's size, in acres or megawatts, and the number of panels were not found. The project adds no homes.
The county Planning Commission pushed its decision on the plan to its September 2024 meeting. Search summaries of the county's minutes say it later gave conditional final approval to the final land development plan in May 2026. The minutes PDFs could not be read directly, so the conditions are unknown.
Search summaries of the January 2025 minutes say a township resident asked the Commission to deny the plan. No news coverage, developer project page or construction report was found. It is unknown whether any work has started on the site.
What it could mean nearby
- Solar farms usually produce little traffic once running, but construction brings truck and equipment trips. No traffic study for this site was found.
- The site is in an agricultural zone, so farmland or open land would be used for solar panels. Acreage was not found.
- No jobs figure, school effect or utility upgrade for this project was found.
Where it stands
County minutes, as summarized in search results, show conditional final approval of the land development plan in May 2026. The developer would normally need to meet those conditions, obtain any remaining state stormwater and township permits, and then build. No source shows permits issued or construction started. Note: The page's 'other' type and missing town conflict with county records that describe a solar energy generating facility in Washington Township. The county's own wording was not independently confirmed because the PDFs could not be read.
- May 2026 County Planning Commission minutes, as summarized, show conditional final approval of the final land development plan
- Jan 2025 County Planning Commission minutes, as summarized, record a township resident asking the Commission to deny the plan
- Oct 2024 County Planning Commission agenda lists the project in Washington Township, agricultural zone, with CVE North America as applicant
- Sep 11, 2024 Date to which the Commission extended its decision on the preliminary/final plans
- Jul 15, 2024 Planning Commission reviewed the time extension for the plans
Who's behind it
CVE North America · A solar developer that builds, finances and operates utility-scale and community solar projects, with projects in New York and Pennsylvania, according to search results.
Around the web
- Planning Commission Minutes, May 2026Schuylkill County · May 2026Per a search summary (the PDF could not be read), the plan received conditional final approval.
- Planning Commission Minutes, January 2025Schuylkill County · Jan 2025Per a search summary (the PDF could not be read), a township resident asked the Commission to deny the plan.
- Planning Commission Agenda Package, October 2024Schuylkill County · Oct 2024Per the county fact-check (the PDF could not be read), the project is in Washington Township, agricultural zone, with CVE North America as applicant and TRC as engineer.
- Planning Commission MeetingsSchuylkill County · Jul 15, 2024Lists the July 2024 meeting that reviewed the time extension.
Planning terms explained
- Land development plan
- A detailed site plan showing what will be built and how, such as the layout, drainage and access.
- Conditional final approval
- Approval that depends on the developer meeting listed requirements before the plan is fully signed off.
- Time extension
- A delay in the deadline for a board to decide, usually requested or agreed to by the applicant.
- Agricultural zone
- A zoning category meant mainly for farming and rural land uses.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 24, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The Schuylkill County Planning Commission handles the land development plan and takes public comment at its monthly meetings. Washington Township may also have its own permit or zoning role, but that was not confirmed.
In Pennsylvania, the municipality decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the the municipality planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the the municipality manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find the municipality's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Mach-One Realty major land development, Pine Grovesame area · other · Pine Grove Borough · filed 2026-05-13
- East Mill Street plan time extension, Pine Grovesame area · other · Pine Grove Borough · filed 2026-06-10
- Land development extension, East Mill Streetsame area · other · Pine Grove Borough · filed 2026-08-12
- Fuel-Up Miners car wash lot annexation and LDsame area · retail & commercial · Schuylkill County (town not stated) · filed 2024-08-14
- Professional office building, Pine Grove Boroughsame area · 1,500 sq ft non-residential, office · Pine Grove Borough · filed 2026-08-12
- Solar project land development (extension)same area · other · Schuylkill County (town not stated) · filed 2024-09-11