Montgomery County · Upper Providence · MCPC #23-0067-002

Catalyst Distribution Ctr at PBP3

Prosperty Drive, Upper Providence, PA · 124,740 sq ft non-residential, warehouse · 10.3 acres

About this project

Prosperity Drive Associates proposes a 124,740-square-foot warehouse on an undeveloped 10.3-acre lot in Providence Business Park in Upper Providence Township. The facility will employ approximately 49 workers and use public water and sewer utilities.

County planning commission: Supports, with comments

Issues raised: stormwater O&M agreement required for shared basins, vegetated swale preferred over gravel basin design, sedimentation risk to Schuylkill River from stormwater discharge, pedestrian path needed to connect to SEPTA Route 99, secondary emergency access required from distance, tree species disease susceptibility and protection fencing needed

Applicant
Prosperity Drive Associates LLC
Engineer / rep.
RETTEW
Zoning
M-1
Cross street
Egypt Road
Approvals needed
preliminary/final plan approval, combined preliminary/final waiver, plan scale waiver, buffer placement waiver, stormwater discharge design waiver, sewage planning exemption
Utilities
public water, public sewer

Filing history

  • 2026-01-22 · MCPC #23-0067-002 · Land Dev Plan, Prelim Plan · 124,740 sq ft
  • 2023-04-11 · MCPC #23-0067-001 · Prelim Plan, Conditional Use · 124,740 sq ft

County review letters
2026-01-22 · UPROV 23-0067-002r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

Prosperity Drive Associates proposes a warehouse of about 124,740 square feet on a 10.3-acre lot in Providence Business Park, Upper Providence Township, Montgomery County. The county filing lists the project as the Catalyst Distribution Center at PBP3. For scale, that is roughly the floor area of two and a half football fields.

The lot is undeveloped now. The county summary says the building would employ about 49 workers and connect to public water and sewer.

No news coverage, township meeting records, developer project page or tenant announcement specific to this project was found online. The details here come only from the county planning filing, which was last updated on 2026-01-22.

What it could mean nearby

Where it stands

The project was in county planning review as of the latest filing on 2026-01-22. Warehouse plans like this usually go to the township planning commission and then the supervisors for land development approval, followed by building permits.

Want to weigh in? Upper Providence Township's planning commission and board of supervisors usually review land development plans at public meetings, and residents can ask the township for agendas and comment there.

Who's behind it

Prosperity Drive Associates LLC · The county filing names it as the applicant. No company website or information on its other projects was found. RETTEW is also listed on the filing.

Planning terms explained
Land development
The township's formal review of a plan to build on a lot, covering things like site layout, stormwater and traffic.
Business park
An area zoned and planned for offices, warehouses and light industry.
Public water and sewer
Connection to municipal utility lines instead of an on-site well and septic system.
Planning commission
A volunteer township board that reviews development plans and advises the elected supervisors.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $16.2M