About this project

Moscariello Development, LLC proposes 17 single-family homes on about 12.2 acres at 425 S. Mennonite Road in Upper Providence Township. The plan uses transferred development rights from six lots in Royersford and divides the two existing parcels into 16 lots served by public water and sewer. The county planning commission said it cannot yet recommend the plan because key information is still missing.

County planning commission: No position

Issues raised: Conditional use approval required for the TDR option; not applied for, Not enough information on the sending property to show it meets TDR criteria, Application proposes 17 units but plan shows 16, Not enough information submitted for a county recommendation

Applicant
Moscariello Development, LLC
Engineer / rep.
Howell Engineering
Zoning
R-1
Approvals needed
conditional use, transfer of development rights
Utilities
public water, public sewer

Filing history

  • 2025-04-03 · MCPC #25-0078-001 · Land Dev Plan, SubDiv Plan, Sketch Plan, Conditional Use · 16 homes

County review letters
2025-04-03 · UPROV 25-0078-001r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

Moscariello Development, LLC has proposed a neighborhood of single-family homes at 425 S. Mennonite Road in Upper Providence Township. The county summary describes about 17 homes, and the county's project data counts 16 new lots. The site is about 12.2 acres. It is made up of two existing parcels that would be divided into 16 lots.

The plan uses a tool called transferred development rights. Under it, the developer gets the right to build more homes here by using rights tied to six lots in Royersford. Those lots are the source of the rights. The homes would connect to public water and sewer.

The county planning commission said it could not yet recommend the plan because key information was missing. No news coverage, developer project page or township hearing record specific to this project was found online.

What it could mean nearby

Where it stands

As of the latest county filing in April 2025, the plan is under review. The county planning commission has not recommended it because information is missing. Next, the township would usually review the plan and hold a conditional use hearing, and the plan would then need subdivision approval.

Want to weigh in? The Upper Providence Township Board of Supervisors would likely decide on the conditional use. Residents can usually comment at its public hearings and meetings, which are listed on the township website.

Who's behind it

Moscariello Development, LLC · The county records name it as the developer of this project. An official company website was not found, and its other projects could not be confirmed.

Planning terms explained
Transferred development rights (TDR)
A system that lets a developer build more homes on one site by buying development rights from land elsewhere, which then stays protected from building.
Conditional use
A use the zoning code allows only after a public hearing, where the township can attach conditions.
Subdivision
The legal process of dividing land into separate building lots.
Public water and sewer
Service from a municipal or authority-run system, rather than private wells and septic tanks.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $9.0M