Montgomery County · Cheltenham · MCPC #26-0106-001

165 Township Line Rd

165 Township Line Road, Cheltenham, PA · 50 homes, 5,390 sq ft non-residential, mixed use · 8.14 acres

About this project

The site near the Jenkintown-Wyncote rail station will be redeveloped as a mixed-use center. An existing office building will be converted to 36 residential units, a new building will be constructed with 50 units and ground floor retail space, and one existing office building will remain unchanged. The site's parking capacity will be expanded.

County planning commission: Supports, with comments

Issues raised: inadequate pedestrian pathways within site and connections to transit station, pedestrian connection from office building dead-ends without curb ramp, need for clear pathways between converted residential building and other site uses, significant site slopes present development constraints

Applicant
Town Line Holdings, LLC
Engineer / rep.
Eric Marshall
Zoning
MU2
Tax parcel
31-00-26662-00-1
Cross street
Greenwood Avenue

Filing history

  • 2026-04-20 · MCPC #26-0106-001 · Land Dev Plan, Prelim Plan · 50 homes · 5,390 sq ft

County review letters
2026-04-20 · CHELT 26-0106-001r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

The developer plans a mixed-use center on about 8 acres at 165 Township Line Road in Cheltenham Township. It is near the Jenkintown-Wyncote rail station. A new building would hold 50 apartments with retail space on the ground floor. An existing office building would be converted to 36 apartments, which brings the total to roughly 86 new homes. Another office building would stay as it is.

The county lists about 5,390 square feet of non-residential space. The plans also expand parking. A June 2026 news report said the new building would sit on about an acre sold to an affiliate of the developer in 2025. The same report said county planners welcomed new housing near the station and suggested improvements to stormwater management.

What it could mean nearby

Where it stands

The project was under local review as of mid-2026. The developer had asked to postpone a township advisory commission review, and the plan is expected to go to the Cheltenham Board of Commissioners. Local approvals, then permits, usually follow before any construction starts.

Who's behind it

Town Line Holdings, LLC · A limited liability company named on the county filing. No official website or information on its other projects was found.

Around the web

Planning terms explained
Mixed use
A development that combines homes with shops or offices on the same site.
Stormwater management
The way a project handles rain runoff so that it does not flood neighbors or overload drains.
Grandfathered
An existing building allowed to remain even though current zoning rules would not permit it today.
Adaptive reuse (conversion)
Changing an existing building, such as an office, to a new use, such as apartments.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The Cheltenham Township Board of Commissioners is expected to decide next, and residents can comment at its public meetings.

In Pennsylvania, Cheltenham decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

Find Cheltenham's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Estimated construction value: $29.4M