Montgomery County · Upper Providence · MCPC #26-0129-001

Providence Self Storage revised Ph2

595 Hollow Road, Upper Providence, PA · 36,420 sq ft non-residential, warehouse · 11.0 acres

About this project

Five new self-storage buildings are being added to the existing Providence Self Storage facility at 595 Hollow Road in Upper Providence Township, expanding the complex to nine buildings total. The facility uses public water and sewer utilities.

County planning commission: Supports, with comments

Issues raised: stormwater maintenance agreement required, non-standard roof drain sizing, combined plan review process waiver, inconsistent with county comprehensive plan

Applicant
Gracia Development, LLC
Engineer / rep.
Bohler Engineering PA, LLC
Zoning
M-1
Approvals needed
stormwater pipe diameter waiver, combined preliminary/final plan waiver
Utilities
public water, public sewer

Filing history

  • 2026-05-13 · MCPC #26-0129-001 · Land Dev Plan, Prelim Plan, Conditional Use · 36,420 sq ft

County review letters
2026-05-13 · UPROV 26-0129-001r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

Five new self-storage buildings are proposed at the existing Providence Self Storage facility at 595 Hollow Road in Upper Providence Township. With them, the complex would grow to nine buildings. The new buildings total about 36,400 square feet of non-residential space on a site of roughly 11 acres.

The site already operates as a family-owned self-storage facility. A trade article from around 2009 described its opening on land the same family had held for generations. The expansion would add to what is already there and would use the existing public water and sewer.

No news coverage, township agendas or minutes, or hearing notices about this expansion were found online. Nothing was found on opposition, approvals or tenants.

What it could mean nearby

Where it stands

A revised plan for this phase was filed with the county on 2026-05-13. Township review and approval of the site plan usually come next. After approval, building permits are issued and construction can begin.

Who's behind it

Gracia Development, LLC · The company is listed on the county filing for this self-storage expansion. Bohler Engineering PA, LLC is the engineering firm listed alongside it.

Around the web

Planning terms explained
Land development
A formal township review of plans to build or expand on a property, covering things like layout, drainage and access.
Revised plan
An updated version of a plan already submitted, with changes to the original design.
Public water and sewer
Connection to municipal water and wastewater systems instead of private wells and septic tanks.
Non-residential square footage
Total floor area of buildings that are not homes, such as storage, retail or office space.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: Upper Providence Township's planning commission and board of supervisors usually review land development plans at public meetings, so residents can comment there or contact the township office.

In Pennsylvania, Upper Providence decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

Find Upper Providence's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Estimated construction value: $4.7M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →